Toronto East United Condos | 82.6m | 24s | SigNature | Giannone Petricone

Yeah - I forgot to post these from last week

PW4IOgj.jpg


pISfFob.jpg
 
Now the want 3 more floors!

Application: Zoning Review Status: Not Started

Location: 93 BERKELEY ST
TORONTO ON M5A 2W8

Ward 28: Toronto Centre-Rosedale

Application#: 16 182662 ZZC 00 ZR Accepted Date: Jun 29, 2016

Project: Multiple-Use Building Addition

Description: Proposal to add 3 additional residential floors to new 21 storey mixed use building (see active BLD 15 250435). Number of residential units increasing from 289 to 327
 
Shoring work underway.

IMG_2007.JPG
IMG_2011.JPG
IMG_2008.JPG
IMG_2009.JPG
 

Attachments

  • IMG_2007.JPG
    IMG_2007.JPG
    418.3 KB · Views: 1,131
  • IMG_2011.JPG
    IMG_2011.JPG
    495.8 KB · Views: 1,113
  • IMG_2008.JPG
    IMG_2008.JPG
    521.2 KB · Views: 1,127
  • IMG_2009.JPG
    IMG_2009.JPG
    571.2 KB · Views: 1,105
Deep hole.

IMG_4145.JPG
IMG_4143.JPG
IMG_4142.JPG
IMG_4144.JPG
 

Attachments

  • IMG_4145.JPG
    IMG_4145.JPG
    290.3 KB · Views: 762
  • IMG_4143.JPG
    IMG_4143.JPG
    636.1 KB · Views: 718
  • IMG_4142.JPG
    IMG_4142.JPG
    646.7 KB · Views: 785
  • IMG_4144.JPG
    IMG_4144.JPG
    537.9 KB · Views: 795
I know the floor is sloped for water drainage - and this may be just my old eyes - but does that slant seem a bit steep?
 
The architectural drawings show a slope of 5% in the drive aisles in the centre of the photos.

42
 

Back
Top