News   Apr 26, 2024
 2.3K     4 
News   Apr 26, 2024
 535     0 
News   Apr 26, 2024
 1.1K     1 

Waterloo Region Transit Developments (ION LRT, new terminal, GRT buses)

I don't care about the last one - only the first!

(Oh, that's not true - I care about all 14 :) I just care way more about that first one arriving - can't wait!!)
 
Up at the OMSF this morning, crews were busy (again!) re-aligning the existing freight track. I wonder why they are moving it so much; this is about the 5th or 6th time it's been shuffled around up there.

IMG_6825.jpg


IMG_6830.jpg


Looking North from Albert McCormic Arena, toward the OMSF. The catpoles start here, heading South.

IMG_6838.jpg


Future Waterloo Park/Seagram/Laurier stop.

IMG_6841.jpg


Heading South, through Waterloo Park.

IMG_6845.jpg


IMG_6846.jpg


The King/Victoria grade separation dome has ends now, and 306, one of GO's new Bombardier cab cars, says hi!

IMG_6849.jpg


IMG_6851.jpg
 

Attachments

  • IMG_6825.jpg
    IMG_6825.jpg
    225.8 KB · Views: 2,112
  • IMG_6830.jpg
    IMG_6830.jpg
    250.4 KB · Views: 2,085
  • IMG_6838.jpg
    IMG_6838.jpg
    269 KB · Views: 2,106
  • IMG_6841.jpg
    IMG_6841.jpg
    151.8 KB · Views: 2,111
  • IMG_6845.jpg
    IMG_6845.jpg
    155.6 KB · Views: 2,055
  • IMG_6846.jpg
    IMG_6846.jpg
    215.8 KB · Views: 2,050
  • IMG_6849.jpg
    IMG_6849.jpg
    185.8 KB · Views: 2,110
  • IMG_6851.jpg
    IMG_6851.jpg
    152.5 KB · Views: 2,044
First Traction Power Substation (TPSS) is onsite! It will be installed this morning along the Waterloo Spur, in advance of the first prototype Bombardier FLEXITY Freedom testing here, later this summer!

IMG_6981.jpg
 

Attachments

  • IMG_6981.jpg
    IMG_6981.jpg
    151.7 KB · Views: 1,601
Finally had the chance to check out ION construction today. Did a walk from Kitchener to Waterloo.

Not going to post pics since most are already on here, but it seems like they are progressing well. Hardly any restrictions on accessing construction sites, despite the "fencing" that is installed.

It seems like most of the major pieces are in place (e.g. intersections), and it is now just a matter of connecting the dots.
 
Was out of town most of the day, so missed the actual TPSS lift, but here are some before and after photos.

IMG_6986.jpg


IMG_6993.jpg


IMG_7017.jpg


IMG_7021.jpg
 

Attachments

  • IMG_6986.jpg
    IMG_6986.jpg
    192.6 KB · Views: 1,449
  • IMG_6993.jpg
    IMG_6993.jpg
    177.9 KB · Views: 1,456
  • IMG_7017.jpg
    IMG_7017.jpg
    155.3 KB · Views: 1,493
  • IMG_7021.jpg
    IMG_7021.jpg
    226.4 KB · Views: 1,472
Down, down, down... the massive excavation at King/Victoria continues...

IMG_7025.jpg


IMG_7028.jpg
 

Attachments

  • IMG_7025.jpg
    IMG_7025.jpg
    275.9 KB · Views: 1,373
  • IMG_7028.jpg
    IMG_7028.jpg
    212.5 KB · Views: 1,402
Looking down Caroline in uptown Waterloo:

IMG_7034.jpg


Trackwork between Seagram and University:

IMG_7036.jpg


IMG_7044.jpg


IMG_7045.jpg


Catenary tensioners have been installed on either side of Columbia; this is where one OCS line will stop, and another will begin:

IMG_7048.jpg


IMG_7049.jpg


IMG_7052.jpg


IMG_7054.jpg


IMG_7056.jpg
 

Attachments

  • IMG_7034.jpg
    IMG_7034.jpg
    172.7 KB · Views: 1,236
  • IMG_7036.jpg
    IMG_7036.jpg
    193.3 KB · Views: 1,260
  • IMG_7044.jpg
    IMG_7044.jpg
    244.9 KB · Views: 1,256
  • IMG_7045.jpg
    IMG_7045.jpg
    188 KB · Views: 1,239
  • IMG_7048.jpg
    IMG_7048.jpg
    260.1 KB · Views: 1,244
  • IMG_7049.jpg
    IMG_7049.jpg
    178.3 KB · Views: 1,239
  • IMG_7052.jpg
    IMG_7052.jpg
    83.5 KB · Views: 1,225
  • IMG_7054.jpg
    IMG_7054.jpg
    116 KB · Views: 1,240
  • IMG_7056.jpg
    IMG_7056.jpg
    198.8 KB · Views: 1,237
Here's a shot of the first Traction Power Substation (TPSS) installed up by the Operations, Storage and Maintenance Facility.

IMG_7071.jpg


The second permanent track switch is now in place:

IMG_7073.jpg


IMG_7077.jpg


Further South along the Waterloo Spur, clips are up on each of the catenary poles, in preparation for installation of the hanger arms that support the actual OCS wire. It's not hard to imagine that in just a few weeks, we'll have catenary installed!
 

Attachments

  • IMG_7071.jpg
    IMG_7071.jpg
    131.4 KB · Views: 1,215
  • IMG_7073.jpg
    IMG_7073.jpg
    265.1 KB · Views: 1,093
  • IMG_7077.jpg
    IMG_7077.jpg
    260.7 KB · Views: 1,100

Back
Top