News   Apr 26, 2024
 1.6K     4 
News   Apr 26, 2024
 345     0 
News   Apr 26, 2024
 910     1 

3080 Yonge Redevelopment (@ Lawrence stn., First Capital, 6s, Kasian)

Can't speak for the inside, but the last time I went by the outside within the last few weeks it looked 80%- 90% complete. Some of the glass still needs to be installed at the corner and the subway entrance isn't complete.
 
Driveby this morning.

IMG_7609.JPG
IMG_7610.JPG
IMG_7608.JPG
 

Attachments

  • IMG_7609.JPG
    IMG_7609.JPG
    220.2 KB · Views: 667
  • IMG_7610.JPG
    IMG_7610.JPG
    185.3 KB · Views: 633
  • IMG_7608.JPG
    IMG_7608.JPG
    236 KB · Views: 750
This project finished incredibly fast!
Nice design, major improvement at this intersection.
I wonder if an elevator was incorporated for the Lawrence Subway station.
 
This looks so tacked on. Pretty terrible IMO.

It basically shares no materiality or patterning similar to the original building. I sort of wish the part with the tan tiles had also been made black like the rest of the addition.
 

Back
Top