Toronto Marcher Towers | 38.66m | 10s | Gull Construction | Rafael + Bigauskas

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
27,381
Reaction score
36,566
Location
by the Humber
Here's one we've missed so far.

East of Bathurst, Village Gate runs south from Steeles down to Greenwin Village Road. Fronting on those three streets is the Marcher Towers, an oddly pluralized name for a single 15-storey white brick slab apartment building that's been around for 40+ years now. In 2014, owner Gull Construction applied to add density to the site with some infill buildings, and over the past two years they have gradually refined the proposal through the planning process, attempting to eliminate concerns of both the Planning Department and the locals. Everything worked out now, they're now looking for rezoning approval from the City.

What's proposed is a single-storey retail commercial building fronting Steeles and Village Gate to the east of the existing tower (no image), and 2 groups of stacked townhomes (28 units) and a 10-storey condominium tower (116 suites with 8 more townhomes in the podium at grade) fronting on Greenwin Village.

755SteelesWStrW1153.jpg


755SteelesWHeroNW1280.jpg


755SteelesWLandscape1280.jpg


Looks like a pretty good intensification of a tower-in-the-park site to me!

42
 

Attachments

  • 755SteelesWHeroNW1280.jpg
    755SteelesWHeroNW1280.jpg
    347.5 KB · Views: 908
  • 755SteelesWLandscape1280.jpg
    755SteelesWLandscape1280.jpg
    227.7 KB · Views: 823
  • 755SteelesWStrW1153.jpg
    755SteelesWStrW1153.jpg
    283.8 KB · Views: 963
Site Plan as per the report:

1601833285821.png


Not exactly an ideal way to address Steeles....
 
  • Like
Reactions: PMT

Back
Top