The new George Brown College Waterfront Campus location on the East Bayfront is quickly coming along.
The KPMB/Stantec designed project will be located at 51 Dockside Drive. The new Health Science Campus is expected to bring 3,500 full-time and 1,500 part-time students to what is currently a dead-zone. This is sure to change once this building opens in 2012 along with the new Corus building, which just opened recently.
Here's a rendering of what we should expect.
posted: 2010-07-01 02:34:09
Related Companies: | Bass Installation, EllisDon, Kramer Design Associates Limited |