Rainforest
Senior Member
I thought their voices were heard and that's why they are getting a subway?
There is a very legitimate complain that whatever the city / province are going to build in Scarborough, takes way too much time. The subway option was on the books since 2013, with committed funding, and entirely under control of the City's transportation department till 2019. Nothing was produced except a pile of studies.
And the active consultations regarding the SRT replacement have been carried out since 2007/8; enough time to design and build any option, it could be running already if the city and the province got their acts together.
On top of that, there are multiple groups of riders whose interests don't always align. Hence even if there were no unreasonable delays, some of the groups would complain because they didn't get what works best for them.