JSF-1
Active Member
I wonder if this will be a turning point for the idea of LRT in Scarborough. With the fact that we won't have the neccissary equipment to even build or operate the SSE, and the fact the ICTS trains won't last much longer; it seems the idea of LRT (an expansion of the Crosstown?) or at the very least updating the SRT to the newer Vancouver standard (the 2006 plan) would be much more appealing. The only thing at this point that could save the SSE is if the Province assumes the cost of ATC conversion and the purchase of new vehicles.