TTC: Flexity Streetcars Testing & Delivery (Bombardier)

thettctransitfanatic

Senior Member
Member Bio
Joined
Mar 7, 2017
Messages
1,547
Reaction score
463
Even though your UT Handle gives one a clue (Fanatic: a person filled with excessive and single-minded zeal, especially for an extreme religious or political cause. ) Why on earth are you so anxious about these new streetcars? As you must know, it will take minutes (at most!) for someone to report that car x or car y has left Kingston or TB/arrived/been put into service/crashed/etc etc. A good New Year resolution might be "Calm down"

But, irconically, it took minutes for you to post the defention of fanatic. You need to stop this, I don't think I need to calm down, I'm calm enough already, I need energy every now and then.
 

smallspy

Senior Member
Member Bio
Joined
Nov 27, 2009
Messages
4,605
Reaction score
4,958
Didn't those two cars have cabs at both ends? They'd need modifications I'd think ... if they weren't converted to Kitchener cars or something ...

One did, one didn't. They may have needed modifications (they certainly needed software), but they've also been at Millhaven for nearly 2 years now. I should hope that they would have had more than enough time to do the work.

Dan
 

jordanmkasla2009

Active Member
Member Bio
Joined
Feb 18, 2017
Messages
281
Reaction score
312
One did, one didn't. They may have needed modifications (they certainly needed software), but they've also been at Millhaven for nearly 2 years now. I should hope that they would have had more than enough time to do the work.

Dan
For a significant portion of that time BBD couldn't even really do anything with them because Metrolinx refused to acknowledge that they even existed.
 

thettctransitfanatic

Senior Member
Member Bio
Joined
Mar 7, 2017
Messages
1,547
Reaction score
463
4519 did a in service 501 test run this evening. 4518 and 4572 could enter service sometime Saturday-Tuesday, I'm guessing. I am pretty sure everyone is looking forward to 4572 to enter service, I know I am.
 

thettctransitfanatic

Senior Member
Member Bio
Joined
Mar 7, 2017
Messages
1,547
Reaction score
463
My office window looks over Queen street. I haven't looked at the numbers online, but it sure seems like the route was approaching 50% flexities today.

Yeah, quite a few Flexities were on Queen today, with the January changes on Monday, the Flexities will appear on 501 in increasing amounts till the route is fully converted sometime around late Spring or early Summer ( for the Humber-Neville section, Long Branch likely won't be converted till the fall ), assuming BBD stays on schedule,
 

nfitz

Superstar
Member Bio
Joined
Nov 10, 2007
Messages
24,351
Reaction score
4,703
Location
Toronto
My office window looks over Queen street. I haven't looked at the numbers online, but it sure seems like the route was approaching 50% flexities today.
11 cars out now, of the 32 scheduled on non-Long Branch service. 35 scheduled earlier today. So about 1/3.

We may have seen our last scheduled CLRV on Kingston Road or King Street with 503 converted to buses after today's rush hour is over. Looks like the last car was 4146 which got back to Russell at about 7:30 pm. Who knows when we'll next see streetcars on 502 or 503.

At the rate they are going, CLRVs are going to become a rare sight other than 506 - though I assume some route will get streetcars back when all the construction bustitutions start for the Roncesvalles/King/Queen intersection work.

Yeah, quite a few Flexities were on Queen today, with the January changes on Monday, the Flexities will appear on 501 in increasing amounts till the route is fully converted sometime around late Spring or early Summer ( for the Humber-Neville section, Long Branch likely won't be converted till the fall ), assuming BBD stays on schedule,
Might be sooner than that. They look to be about 25 cars short currently to fully convert 501A. But once the construction bustitutions start February, they'll need less cars on 501A (maybe about 7?), and they'll need about 7 less cars on 504A.

So perhaps only 11 more cars needed for full conversion of 501? 8 new cars entered service in December - and they have 5 cars currently being prepared for service.

If construction bustitiution starts February 17, then we might just see all-Flexity service on 501 before Spring starts!
 
Last edited:

thettctransitfanatic

Senior Member
Member Bio
Joined
Mar 7, 2017
Messages
1,547
Reaction score
463
11 cars out now, of the 32 scheduled on non-Long Branch service. 35 scheduled earlier today. So about 1/3.

We may have seen our last scheduled CLRV on Kingston Road or King Street with 503 converted to buses after today's rush hour is over. Looks like the last car was 4146 which got back to Russell at about 7:30 pm. Who knows when we'll next see streetcars on 502 or 503.

At the rate they are going, CLRVs are going to become a rare sight other than 506 - though I assume some route will get streetcars back when all the construction bustitutions start for the Roncesvalles/King/Queen intersection work.

Might be sooner than that. They look to be about 25 cars short currently to fully convert 501A. But once the construction bustitutions start February, they'll need less cars on 501A (maybe about 7?), and they'll need about 7 less cars on 504A.

So perhaps only 11 more cars needed for full conversion of 501? 8 new cars entered service in December - and they have 5 cars currently being prepared for service.

If construction bustitiution starts February 17, then we might just see all-Flexity service on 501 before Spring starts!


Definitely the last CLRV on King Street, Kingston Rd, not sure when it or 502 will be converted, highly rumoured that 511 will get streetcars back ( it will ), presumably sometime between February and April, and yes, construction bustitution does start on February 17th for 501L, but those 7 could also be used for 511.
 
Last edited:

nfitz

Superstar
Member Bio
Joined
Nov 10, 2007
Messages
24,351
Reaction score
4,703
Location
Toronto
... yes, construction bustitution does start on February 17th for 501L
I'd heard that, but if you look at the construction tender, the original closing date of December 6 has slipped to January 31. This makes me wonder if construction won't be starting in February, and bustitution will be delayed. Though it wouldn't be the first time that TTC switched to buses long before construction started.

Though the bigger impact is not the 501L bustitution but the ones for 501A and 504A, which reduces the streetcar demand by another 14 or so cars.

They will also freed up 8 cars from 503 with the January 6 2019 board, and the was 8 cars from October 2018 when they cut back on the 504/514 service. That's at least 21 and up to 37 cars available for additional service, somewhere.

... but those 7 could also be used for 511.
It only takes about 12 CLRVs to run 511.

Additional options are the 4 or so cars needed to remove AM peak buses on 506, 7 cars for 502, and 18 cars for 505.
 

thettctransitfanatic

Senior Member
Member Bio
Joined
Mar 7, 2017
Messages
1,547
Reaction score
463
I'd heard that, but if you look at the construction tender, the original closing date of December 6 has slipped to January 31. This makes me wonder if construction won't be starting in February, and bustitution will be delayed. Though it wouldn't be the first time that TTC switched to buses long before construction started.

Though the bigger impact is not the 501L bustitution but the ones for 501A and 504A, which reduces the streetcar demand by another 14 or so cars.

They will also freed up 8 cars from 503 with the January 6 2019 board, and the was 8 cars from October 2018 when they cut back on the 504/514 service. That's at least 21 and up to 37 cars available for additional service, somewhere.

It only takes about 12 CLRVs to run 511.

Additional options are the 4 or so cars needed to remove AM peak buses on 506, 7 cars for 502, and 18 cars for 505.

Apologize for getting off-topic, but 511 will get streetcars back sometime between February and April, not 502 or 505. 505 still has the water main work along Dundas, and 502, who knows when it will get them back. I think likely the busitution for 501L will happen first with February Board, and construction will pick up eventually.
 