from Daily Commercial News, Steeles Ave. West Station....
SUBWAY STATION Proj: 9073415-7
Toronto, Metro Toronto Reg ON WORKING DRAWINGS
Steeles Ave West Station, Keele St, Jane St, M6L
$20,000,000 est
Start: June, 2011 Complete: November, 2012
Note: Tender for Contractors to complete cut and cover and track to connect Spadina to the Wilson Yard has been issued, report number 9104634. Arch is undertaking preliminary Station concept plans and design. An Information Session will be held by the Owner for interested Design/Build Contractors and Consortia December 4, 2009. INFORMATION is available at www.ttc.ca. Owner expects to issue a Design/build/Bid proposals for Consortia to complete Working drawings and Contract management Summer 2010. Individual Consortia will be awarded late 2010. Tender and construction schedules will are undetermined. Further update late Summer, 2010.
Project: concrete foundation, concrete tilt-up structural frame, fuel fired heating system, proposed construction of a new Steeles Avenue West Subway station as part of the extension of the Spadina subway followed under report number 1309236. The station will include a 30-40 bay bus terminal and passenger pick-up. The area surrounding the station would include a pedestrian plaza on the north side of Steeles Ave and commuter parking for up to 3,000 cars.
Scope: 5,000 m²; 1 storey; 2 storeys below grade; parking for 3000 cars
Development: New
Category: Passenger terminals; Tunnels, subways; Retail, wholesale services; Misc engineering
SUBWAY STATION Proj: 9073415-7
Toronto, Metro Toronto Reg ON WORKING DRAWINGS
Steeles Ave West Station, Keele St, Jane St, M6L
$20,000,000 est
Start: June, 2011 Complete: November, 2012
Note: Tender for Contractors to complete cut and cover and track to connect Spadina to the Wilson Yard has been issued, report number 9104634. Arch is undertaking preliminary Station concept plans and design. An Information Session will be held by the Owner for interested Design/Build Contractors and Consortia December 4, 2009. INFORMATION is available at www.ttc.ca. Owner expects to issue a Design/build/Bid proposals for Consortia to complete Working drawings and Contract management Summer 2010. Individual Consortia will be awarded late 2010. Tender and construction schedules will are undetermined. Further update late Summer, 2010.
Project: concrete foundation, concrete tilt-up structural frame, fuel fired heating system, proposed construction of a new Steeles Avenue West Subway station as part of the extension of the Spadina subway followed under report number 1309236. The station will include a 30-40 bay bus terminal and passenger pick-up. The area surrounding the station would include a pedestrian plaza on the north side of Steeles Ave and commuter parking for up to 3,000 cars.
Scope: 5,000 m²; 1 storey; 2 storeys below grade; parking for 3000 cars
Development: New
Category: Passenger terminals; Tunnels, subways; Retail, wholesale services; Misc engineering