Time and Space Condos | 102m | 29s | Pemberton | Wallman Architects

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
10,557
Reaction score
5,362
Location
St Lawrence Market Area
I assume this is the third crane (at southern end of the site)
.
LOWER SHERBOURNE ST From THE ESPLANADE To FRONT ST E

Toronto-TMC: Full closure erecting a tower crane

Closure Type:Construction (Planned)

Time Frame:Continuous

From Dec 7, 2019 at 07:00 a.m.

Until Dec 7, 2019 at 07:00 p.m.

Impact:Moderate

Road Class:Minor Arterial

District:Toronto and East York

Contractor:Lift All Crane Rentals

ID:R115754
 
Last edited:

Top