This is also yet another example of a project where a developer has started excavation etc without actually having an approved building plan. They achieve this by applying for a permit for 'soil remediation'. Apparently, these permits do not require permanent fencing etc and if a site has been 'remediated' this can be used to get approval of a building with same footprint.
 

kathy365

New Member
Member Bio
Joined
Jul 18, 2018
Messages
5
Reaction score
2
http://pembertongroup.com/time-and-space-community/construction-update/ notices Pembertong group website update the construction update, it looks they plan to finish the construction around Jan 2023.

Under construction management plan tab, it is in stage one now.
===========================================================================

  • Stage one: This will involve temporary chain link fence comes with screen to allow for internal shoring drilling as the installation of a permanent plywood hoarding will impede heavy equipment at the perimeter. In addition to the temporary fence, rolling scaffold overhead protection will be used on the sidewalks with pedestrian control personnel stationed at the rolling scaffolding when required.
Start: August 2018 End: May 2019

  • Stage two: Upon shoring drilling completion and prior to bulk excavation start the temporary chain link fence will be replaced with plywood hoarding and overhead protection at the perimeter of the site. The estimated date for delivery of public art on hoarding will take place post hoarding and overhead protection completion and as approved by local Councillor.

Start: April 15, 2019 End: September 2022
  • Stage three: Upon completion of the all exterior assemblies and prior to streetscape construction the plywood hoarding will be removed and a temporary fence provided.
Start: September 2022 End: January 2023

All gates will be locked during hours where no construction activity is occurring. Appropriate signage will be installed to ensure that the safety of pedestrians, cyclists and motorists is considered at all times. Adjacent sidewalks with overhead protection will have appropriate lighting to ensure adequate visibility at all times of the day and night.
 

evandyk

New Member
Member Bio
Joined
May 21, 2019
Messages
43
Reaction score
220
I live just to the north of this, and my very nice lake view will disappear when this project gets up to 16 storeys. I will be happy to trade excellent photos of the work site for any other information on its progress.
 

GTAConstruction

New Member
Member Bio
Joined
Apr 25, 2019
Messages
4
Reaction score
4
I live just to the north of this, and my very nice lake view will disappear when this project gets up to 16 storeys. I will be happy to trade excellent photos of the work site for any other information on its progress.
That would be a great idea if you can post photos from above.
 