The buildings on the Site have now been demolished, and the excavation of the Site and construction of the entire underground parking and loading structure has commenced. Tridel and Woodbourne will participate in this and other phases of the construction and pay for their share of the underground parking spaces required for the Residential Component in accordance with an agreed formula. With the addition of Tridel and Woodbourne to the development process, the intention is to complete the entire development during one continuous construction period rather than in a phased approach.
 
won't want to be here on move in day.

Separate parking garage entrances for the buildings on Wellington and on Front.

Each tower has its own below grade bank of elevators and moving in rooms. One entire floor of the parking structure garage is dedicated to loading and moving exclusively.
 
Pics taken Oct 5, 2017

BAUER BG 28 added to the site.

EYoNGzq.jpg



KzHnZSI.jpg
 
Well, this will be fun.
Indeed this will be very fun. Front Street along this stretch has always seemed a forgotten area. Especially along the south side of the street. I always thought it should be a linear park of some sort. Now with the rail deck proposal this will be cleaned up sooner rather than later.
 

Back
Top