The Well | 174.03m | 46s | RioCan | Hariri Pontarini

Red_Bulmer

New Member
Member Bio
Joined
Apr 13, 2011
Messages
64
Reaction score
92
Location
King West
From the exceptionally sunny Sunday the 24th. Blocking off the CN Tower view for much of the Westend.
1650920436229.png
 

Red Mars

Senior Member
Member Bio
Joined
Nov 4, 2009
Messages
5,166
Reaction score
38,238
Location
Toronto
Apr 26, 2022

More hoarding taken down on Wellington to make way for the new sidewalk in the works from both ends of the project.

The double stacked office trailers have been removed from the Wellington Cat Promenade.


21979D63-67DC-49BB-A4B0-DFF7FEFD26B0.jpeg



871CF448-01EF-4504-BA47-F1108DAD3789.jpeg



F3ED123A-3888-43F3-AEA1-516EAB2510AA_1_201_a.jpeg



8C9947DA-3EBF-4323-8D2C-353F04548088_1_201_a.jpeg



CD4BE8DF-0E96-4FB5-9266-2FB89454CFC7.jpeg



48111F97-9755-4219-9597-7571AC6E2C80.jpeg



77BE64F6-A9D6-4346-ADB6-28EFCC3FE71F.jpeg



EF813337-5F22-4FB5-9D00-6B39DEFDD71D.jpeg



43A53D88-C657-480F-860A-E07136A2C731.jpeg



1840CEB1-8FAB-4FA8-B375-A7295FCE7163.jpeg



7D9456ED-8ED9-44EB-A545-6AAADB4CE30D.jpeg



85200ED7-8016-4AEF-9372-69CA773702B1.jpeg


The future site of the Wellington Cat Promenade having access to King St.

40227899-0E0F-4E65-BA2D-977AD2EACA79.jpeg



91FD0915-6247-45C3-AA11-8137EA2E8185.jpeg



1A6C5AEB-C00E-4A4B-9F01-69CF8DDD4534.jpeg
 

AHK

Senior Member
Member Bio
Joined
Jan 12, 2010
Messages
1,521
Reaction score
4,807
April 28, 2022 - The View From Here:

Building A - 16 Floors - Topped off, crane gone
Building B - 16 Floors - Topped off, crane gone
Building C - 14 Floors - Topped off, crane still present
Building D - 22 Floors - Looks like all residential floors complete, work on mechanical penthouse underway
Building E - 39 Floors - Residential floors complete, work on mechanical penthouse underway
Building F - 46 Floors - Still rising
Building G - 36 Floors - Close to complete, interior finishes underway, ground level exterior work underway, occupancy starting soon

View of the CN Tower: Gone

20220428_174258.jpg
 
Last edited:

SkyWard

New Member
Member Bio
Joined
Apr 2, 2013
Messages
11
Reaction score
0
Location
Mississauga
I'm a fan of this project however one thing irks me, and that is the cross bracing on the northside isn't as pleasing as it is on the Southside of this building. A stellar project however it has that flaw. It just looks sloppy from the north. My two ¢.
 

Tunafish13

Active Member
Member Bio
Joined
Jun 19, 2019
Messages
219
Reaction score
347
Is there any real reason why it's not fully enclosed? Like, why leave those little gaps on either side? If it rains or snows at all, there will still be some coming through those gaps.

Either way though, it does look stunning
 

ProjectEnd

Superstar
Member Bio
Joined
May 28, 2007
Messages
12,169
Reaction score
25,088
It was always envisioned to just be a cover. Enclosing it means that not only is it a far more complicated and complex building with different HVAC requirements, it also makes all of that 'exterior' space interior GFA. There were other things too, but it was never contemplated as an interior mall.
 