Toronto The Taylor | 121m | 36s | Tricon | Diamond Schmitt

A valid assumption on their part though. The current LCBO building was always going to be a temporary structure. It's taken longer for it to be developed than some assumed but it's always been a 'when' not an 'if'.
 
Last edited:
Today

IMG_0750.JPG
 
Execution is reminding me a lot of the "Triangle Park" condos at Queen and Abell - here's hoping the interiors and management doesn't follow in their path, same with the fate of their builder.
 

Back
Top