The One | 338.3m | 94s | Mizrahi Developments | Foster + Partners

Benito

Senior Member
Member Bio
Joined
Mar 12, 2014
Messages
6,870
Reaction score
39,540
Location
Yonge and Bloor
Today.
F3FD2FDC-AFAC-4FEA-9F2C-3A6B7DD82AAB.jpeg
80CDAB58-B23B-4200-B53C-A049E4F88BC3.jpeg
3C15F920-2BE6-4E15-8945-0424F98C23EB.jpeg
E9BC24A1-D01E-4181-8FDC-849ADDD9B433.jpeg
A6CF1B3B-8459-4888-B299-D333C0581D2E.jpeg
D7F2E53F-B614-433B-B85B-8E60FFEDD72E.jpeg
35623BEE-9D9E-4AD1-A5E5-8A330FBE84CF.jpeg
 

spaced

Active Member
Member Bio
Joined
May 7, 2007
Messages
603
Reaction score
174
Am I correct to observe that the super-columns are turning into just reinforced concrete and there will be no more steel sections installed?
Makes sense. After the podium is done it would be likely overkill ...and they must cost a fortune.
 

justathought

New Member
Member Bio
Joined
Jan 7, 2021
Messages
39
Reaction score
117
Am I correct to observe that the super-columns are turning into just reinforced concrete and there will be no more steel sections installed?
Looks like they are being formed out from the next concrete pour, which would lead me to think that we might see another super column metal prefab piece placed on top of the current column tops?
 

fanoftoronto

Active Member
Member Bio
Joined
Jan 13, 2010
Messages
580
Reaction score
1,833
Location
Everywhere and Nowhere
Looks like they are being formed out from the next concrete pour, which would lead me to think that we might see another super column metal prefab piece placed on top of the current column tops?

They're getting ready for the floor pour though. If they have another super-column prefab piece, then now would be the time to install it, before pouring the floor of the next level.
 

fanoftoronto

Active Member
Member Bio
Joined
Jan 13, 2010
Messages
580
Reaction score
1,833
Location
Everywhere and Nowhere
Like I said above, they look like they are being excluded from the area that will be poured.

Apologies, didn't read your post or look at the pictures correctly to notice that the super-column sections are formed out of the floor pour. You're right, we might get another, smaller panda. But the design only states steel sections are required for the 2 Yonge Street side super-columns. Who knows! But the pace they're working, we're bound to find out in the next few days!
 