I find it curious that construction is concentrating on the lower southern portion of the project while the tower will take much longer to construct. I can only assume that they want to set up the yellow crane and remove and black heavy lift northern crane as soon as possible. Does anyone know any more one this subject?
 

ciceror

Active Member
Member Bio
Joined
Sep 14, 2020
Messages
198
Reaction score
335
I find it curious that construction is concentrating on the lower southern portion of the project while the tower will take much longer to construct. I can only assume that they want to set up the yellow crane and remove and black heavy lift northern crane as soon as possible. Does anyone know any more one this subject?
yellow crane is needed for the tower, black crane will be removed eventually
 

Benito

Senior Member
Member Bio
Joined
Mar 12, 2014
Messages
6,263
Reaction score
31,022
Location
Yonge and Bloor
From the street today.
F7539E03-F38E-49F6-AEDA-3B2702FA7B15.jpeg
F50F3C59-C58F-4224-B7DF-FCAFCDADF062.jpeg
CB47D5B2-6E17-47F1-9E06-A2342EAE5A76.jpeg
9EB77B1C-44EF-40F1-ADF2-35252C37C7F8.jpeg
97CD0D46-B64F-42C0-89E6-5BCECB161DFE.jpeg
E36A895E-658B-484D-8AE9-8EF6714135B3.jpeg
7006EB9C-588A-4B6E-945F-56533E0A2D57.jpeg
3C385898-C013-413E-90B0-F5B7AE3E7503.jpeg
59E85CC5-B0A2-4A66-96E8-8C2AEDAFB866.jpeg
 

whatever

Senior Member
Member Bio
Joined
Nov 25, 2007
Messages
2,667
Reaction score
353
Looking at those climbing platforms on the columns, now I get why they haven't put the hangers on yet. Those platforms need to get up above the upper brackets for the hangers, or else the hangers would prevent the platforms from climbing. Or else, they'd have to tie up the crane to remove each of the platforms, fly them up to the next point, and then re-attach them.
 

HometownPride

New Member
Member Bio
Joined
Oct 7, 2020
Messages
9
Reaction score
18
Location
New Hampshire
I also see why they have those corner notches in the uppermost slab; to allow for the diagonal braces to come down and attach to the slab just below, the corners of which are currently being held up by the yellow support posts. I swear I'll have a degree in building construction (or at least static structures) by the time this building's completed.
 

UtakataNoAnnex

Senior Member
Member Bio
Joined
Mar 5, 2020
Messages
2,015
Reaction score
2,204
yellow crane is needed for the tower, black crane will be removed eventually
It will have to be removed to access construction of the 'vator cores, I gather. As I believe this juggling around of cranes will be the next crucial step/milestone for this project.
 

Benito

Senior Member
Member Bio
Joined
Mar 12, 2014
Messages
6,263
Reaction score
31,022
Location
Yonge and Bloor
Digging trenches on Balmuto to install gas lines for The One. The line will run up the lane way on the south side of 35 Balmuto. Edited to update the laneway since they started to cut for digging this morning. I was told north laneway originally.
8B7DE676-852D-440F-9DCB-BE77F8FA9A88.jpeg
82728423-82F5-4FA4-A808-4AEB0E4C8D97.jpeg
 
Last edited:

Undead

Senior Member
Member Bio
Joined
Sep 3, 2020
Messages
1,162
Reaction score
2,223
^That's not even the most expensive Rolls, I think. Looks like a Ghost--weak sauce. You want the big daddy Phantom or the SUPERKOOL Cullinan.
edit: it's a Wraith. still weak sauce.
 

officedweller

Senior Member
Member Bio
Joined
Apr 24, 2007
Messages
2,568
Reaction score
858
Looking at those climbing platforms on the columns, now I get why they haven't put the hangers on yet. Those platforms need to get up above the upper brackets for the hangers, or else the hangers would prevent the platforms from climbing. Or else, they'd have to tie up the crane to remove each of the platforms, fly them up to the next point, and then re-attach them.
I also see why they have those corner notches in the uppermost slab; to allow for the diagonal braces to come down and attach to the slab just below, the corners of which are currently being held up by the yellow support posts. I swear I'll have a degree in building construction (or at least static structures) by the time this building's completed.

That must also mean that each braced corner needs to be engineered to temporarily support the load of the unbraced corner above it (via the yellow support posts) before the corner above is secured with the bracing.
 

Top