The next segments that go on top of the banana yellow support structures should be a very interesting segment. It should be a piece that looks like a plus sign (+) that bridges the 2 lower angle support structures with their respective extensions on the next level. It should also have load transferring plates to transfer loads from the restaurant (event space) floor to the lower angle support structures.

I don't think I was able to explain it properly, but I wanted to showcase my excitement for this next segment!

Also, echoing everyone's appreciation for the amazing pictures from @Benito, @thaivic, and all the folks taking pics while walking by the site! Thanks!
 

Benito

Senior Member
Member Bio
Joined
Mar 12, 2014
Messages
6,049
Reaction score
27,964
Location
Yonge and Bloor
Update, new interesting looking piece of the puzzle arrived a few minutes ago while I was out for a walk at lunch.
83B7B2C3-5F5D-4C27-9FF3-7C8D19D7C7C0.jpeg
9472A070-0456-4070-A7C1-C671EFE54A7E.jpeg
D55F64D7-5334-49DD-A276-643AF0209DE5.jpeg
BAB6DDF8-E9D5-4F85-9507-9BFB5E162A7F.jpeg
52DFCD59-2091-4CA9-BEB1-D81FB742C5EE.jpeg
C73D6C9B-8E49-4839-BA10-6EF8A0CD60F9.jpeg
AB813751-DBB1-4F73-9B81-C65C07B82685.jpeg
79BA3D31-AC97-418D-B706-04E49C6A6E8A.jpeg
 

AlvinofDiaspar

Moderator
Member Bio
Joined
Apr 22, 2007
Messages
29,090
Reaction score
18,555
Location
Toronto
If you flip the piece 90 degrees clockwise, you can see that it would fit nicely at the top of diagonal pillars+yellow support tripod pictured on the left.

Yup, see below for illustration - flip the node over - the asterisks connects, the plane in the first pic (formed by the extended plates with the boltholes) represents the upper floor - note: not saying this node will go to this specific connection.

1602104096781.jpeg


1602104126839.jpeg

(pics by @Benito)

AoD
 
Last edited:

jozl

Active Member
Member Bio
Joined
May 7, 2007
Messages
398
Reaction score
285
It never dawned on me that while above grade construction was suspended due to permit issues the super columns were being assembled off site all along. What a pleasant surprise. This is awesome.
 

macro

New Member
Member Bio
Joined
Apr 11, 2020
Messages
7
Reaction score
78
It never dawned on me that while above grade construction was suspended due to permit issues the super columns were being assembled off site all along. What a pleasant surprise. This is awesome.
Does anyone know where?
 

someMidTowner

¯\_(ツ)_/¯
Staff member
Member Bio
Joined
Sep 2, 2011
Messages
9,091
Reaction score
13,317
Location
(Former) Ward 16
Does anyone know where?
The structural steel supplier is Walters Group. They have a few plants but my guess is that these are being fabricated at their Stoney Creek facility
 

macro

New Member
Member Bio
Joined
Apr 11, 2020
Messages
7
Reaction score
78
The structural steel supplier is Walters Group. They have a few plants but my guess is that these are being fabricated at their Stoney Creek facility
what are the odds. I’m based in Winona. I could take a swing by there tomorrow to see if any future pieces are on site.
 

3Dementia

Senior Member
Member Bio
Joined
Apr 24, 2007
Messages
2,644
Reaction score
1,891
what are the odds. I’m based in Winona. I could take a swing by there tomorrow to see if any future pieces are on site.

Pretty sure my brother-in-law Casey has a management job at Walters in Stoney Creek (unless he just retired), and he knows full well what a skyscraper geek I am... the bugger!

Suffice to say I am following up with him. 😒
 

AlvinofDiaspar

Moderator
Member Bio
Joined
Apr 22, 2007
Messages
29,090
Reaction score
18,555
Location
Toronto
So one thing I find interesting is that there are no horizontal attachment points for the first hanger exoskeleton. I wonder how they transfer loads from the hanger to the super-column.

View attachment 274964
View attachment 274965

1602120274575.png


I think you are assuming that it will be connecting to the first section of the megacolumns - I think it is higher in the second section because the node itself will add some additional height (that's also where you have a plate sticking out). Another giveaway is that the two diagonal columns are touching at the (false) ceiling - but not as they are installed right now. Also I am not sure how much loads they will need to transfer at this level given it's already supported...

1602120559322.png


It will be interesting to see how the structure evolves.

AoD
 
Last edited:

UtakataNoAnnex

Senior Member
Member Bio
Joined
Mar 5, 2020
Messages
1,142
Reaction score
1,139
Yup, see below for illustration - flip the node over - the asterisks connects, the plane in the first pic (formed by the extended plates with the boltholes) represents the upper floor - note: not saying this node will go to this specific connection.

View attachment 274909

View attachment 274910
(pics by @Benito)

AoD
I think it helps to note this asterisk of iron goodness, are in fact are likely two objects that will join up with those diagonal support columns per corner in the eventual. They are together like that as picted likely for ease of transport...being awkward shapes and all. If they ain't that, I'll eat a pigtail!
 