St Lawrence Condos at 158 Front | 91.44m | 26s | Cityzen | architectsAlliance

Edward Skira

http://skyrisecities.com
Staff member
Member Bio
Joined
Apr 22, 2007
Messages
14,263
Reaction score
13,198
Location
Toronto
IMG_3762.JPG
IMG_3761.JPG
IMG_3760.JPG
 

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
12,073
Reaction score
8,068
Location
St Lawrence Market Area
They have removed the pedestrian protection over the Front St sidewalk and are creating two new gates for trucks. I assume they may now close the gates on Sherbourne & Frederick.
 

Breeze

New Member
Member Bio
Joined
Jun 28, 2017
Messages
13
Reaction score
2
This is what the construction website says:

Work commenced this week on taking down and rebuilding the hoarding and overhead protection on Front Street East. Once completed, the hoardings and overhead protections will be reinstalled with 3 access points on Front Street.
As we noted in previous posts, concrete trucks will continue to use the Frederick Street gates. The new construction access points along Front Street East, between Sherbourne and Frederick, will be used for deliveries and to facilitate the installation of the hoists (external construction elevators).
As we also noted previously, there will be no parking on this section of Front Street for the duration of construction and the Toronto Parking Authority meter has been removed.
 

Top