drum118
Superstar
This is the 2nd of 3 phases of Gramercy Park, as its stands from my point of view. The 3rd phase will be 3 Tippet Rd, that is currently own by the Toronto School Board.
The current Gramercy Park sales office is using the north end of the existing building and the south end is been rented out. I was expecting this from day one.
There is to be a divider driveway and centre area between the 2 projects with a 14 story building going north-south to line up with the current ones being built and a 2 story building at the south end, tiding the 2 buildings together along the lines like the north end. There will be a walkway from the building that will connect to the school, just east of the site.
Photos to follow
The current Gramercy Park sales office is using the north end of the existing building and the south end is been rented out. I was expecting this from day one.
There is to be a divider driveway and centre area between the 2 projects with a 14 story building going north-south to line up with the current ones being built and a 2 story building at the south end, tiding the 2 buildings together along the lines like the north end. There will be a walkway from the building that will connect to the school, just east of the site.
Photos to follow