Toronto Sixty Colborne Condos | 82.29m | 25s | Freed | a—A

Driveway.

IMG_8028.JPG
 

Attachments

  • IMG_8028.JPG
    IMG_8028.JPG
    230.2 KB · Views: 487
Coming along st grade. Still no auburn above :(

FC580A2A-C3F8-4E41-99E0-9EA663D91280.jpeg
54D3E5F1-62B4-4DB6-9E09-69F8A6969BA4.jpeg
08F05225-FD98-4368-A0C4-8D251309A4E2.jpeg
 

Attachments

  • FC580A2A-C3F8-4E41-99E0-9EA663D91280.jpeg
    FC580A2A-C3F8-4E41-99E0-9EA663D91280.jpeg
    329.6 KB · Views: 658
  • 54D3E5F1-62B4-4DB6-9E09-69F8A6969BA4.jpeg
    54D3E5F1-62B4-4DB6-9E09-69F8A6969BA4.jpeg
    306 KB · Views: 517
  • 08F05225-FD98-4368-A0C4-8D251309A4E2.jpeg
    08F05225-FD98-4368-A0C4-8D251309A4E2.jpeg
    269.1 KB · Views: 597
Still no auburn above :(
My experiences in this thread lately:
"Oh boy, a new update! I bet it's finally the orange glass"
clicks post
"Nope."

One day later:
"Oh boy, a new update! I bet it's finally the orange glass"
clicks post
"Nope."

Repeat.

That said, I do appreciate all the updates. I'm just getting impatient with the glass.
 
They are just messing with us. The orange will magically appear on the building some random morning haha!
 
I believe the drawings had glazed curtain wall going on top of those insulated panels
 
Come on now, it's the classic Toronto bait-and-switch.* Can't believe you guys fell for the hype.

* (Also known as "value engineering", or The Cheapening)
 
Yes, coloured panels of some sort are coming. Has nobody noticed that some things take a while to happen sometimes, and occur not on our schedules but on theirs?

42
 

Back
Top