June 24
More up on site. Steel up for the first 2 floors at the south end as of June 30
18697514593_30a7f8d365_b.jpg


19130521328_e44cf66b63_b.jpg


19131989269_a117c3676d_b.jpg


19292063836_9406e908ac_b.jpg


19130538308_e0ce470fbc_b.jpg


19132018509_8bef74dfdb_b.jpg
 
Was right about a bridge going between the 2 buildings over Sq One Dr.

Safe to say ModS 4/5s building depending how you class the base floor.

2 Large truss were installed today for a Plus 30 Walkway bridge. Had some fun getting the 2nd truss in place as the hording was in the way at the south end and you could hear the chucking sound as the truss was moved into position and pushing the hording out of the way.

Both trusses were assembly on site as bolted member.

The steel and decking in place for the first 2 of 4 floors for the south end. The floor slab for the north section is 98% complete to the point the forming material being remove from site.

It amassing that Bondfield can have crews working on this site, but can't find them for the 2 GO Stations that they are late on already.

Photos to follow when I finish rebuilding a number of systems that have crash in the last 48 hours and reinstall the software. Really hate 8 & 8.1
 
July 9
luck out to catch the erection of the 2nd truss and a lot more shots up on site.
Looks like a 16-21 wf beam turn on its side to support the bottom of the truss and 12 wf at the top with HSS bridging. All connections are bolted.
19612170216_06492b51b3_b.jpg


19015811284_c718f3e2f8_b.jpg


19017442793_6465383e33_b.jpg


19612230036_674c65784f_b.jpg


19451813159_bf6a11fba2_b.jpg


19451846859_f348b00ed2_b.jpg


19017509923_02bb990251_b.jpg


19015952594_4af314c145_b.jpg


19631315872_e4f547177f_b.jpg


19642987891_3d7e5bfde0_b.jpg


19450500780_8973b0ea96_b.jpg


19642933581_ac7e0c41ff_b.jpg


19450472310_3dcf88deae_b.jpg
 
Mods!! There is 3 floors of steel with the ground and first floor concrete. I would class this as a 5s building even though the ground floor is below grade on Duke of York side. Steel going up for the north section now. You can call it 4s with Duke less ground floor.
July 24
20231156109_52179fa1e7_b.jpg

20231162899_4e9e0e87e2_b.jpg

20231256409_dafee53cbd_b.jpg

20417893145_bf829e63a0_b.jpg

20231258889_6bffb12088_b.jpg

20231276009_fccf598203_b.jpg
 