More up on site. Steel up for the first 2 floors at the south end as of June 30










 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
14,275
Reaction score
6,634
Location
Mississauga, where cars rule city growth
Was right about a bridge going between the 2 buildings over Sq One Dr.

Safe to say ModS 4/5s building depending how you class the base floor.

2 Large truss were installed today for a Plus 30 Walkway bridge. Had some fun getting the 2nd truss in place as the hording was in the way at the south end and you could hear the chucking sound as the truss was moved into position and pushing the hording out of the way.

Both trusses were assembly on site as bolted member.

The steel and decking in place for the first 2 of 4 floors for the south end. The floor slab for the north section is 98% complete to the point the forming material being remove from site.

It amassing that Bondfield can have crews working on this site, but can't find them for the 2 GO Stations that they are late on already.

Photos to follow when I finish rebuilding a number of systems that have crash in the last 48 hours and reinstall the software. Really hate 8 & 8.1
 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
14,275
Reaction score
6,634
Location
Mississauga, where cars rule city growth
July 9
luck out to catch the erection of the 2nd truss and a lot more shots up on site.
Looks like a 16-21 wf beam turn on its side to support the bottom of the truss and 12 wf at the top with HSS bridging. All connections are bolted.
























 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
14,275
Reaction score
6,634
Location
Mississauga, where cars rule city growth
Mods!! There is 3 floors of steel with the ground and first floor concrete. I would class this as a 5s building even though the ground floor is below grade on Duke of York side. Steel going up for the north section now. You can call it 4s with Duke less ground floor.
July 24





 