Toronto Rodeo Drive Condominiums | 106.1m | 32s | Lanterra | Hariri Pontarini

And I would have to agree. It looks like what you would get if you programmed a computer to make a building that maximizes profit while adhering to the code and planning guidelines, and only just.
 
Rodeo Drive condos will be the fourth condo development at the Shops at Don Mills. The 32-storey first phase is mostly sold out now, and the 16-storey second phase is now in sales. These will be to the east of Liv Lofts.

DSC08802.jpg

The fifth condo development will likely be the clear acrylic towers in front Rodeo Drive scale models. It's all zoned, so it can go ahead whenever they're ready to start selling it.

At the other end of the sales centre is the larger scale model of the two Rodeo Drive buildings. The brown frames very abstractly represent the 15-storey Liv Lofts building.
DSC08803.jpg
DSC08804.jpg

DSC08806.jpg

Glass-sided infinity pool atop the 32-storey podium. Woohoo!

Tree-lined, restaurant patio-edged walkway (leading to the new park) between the two Rodeo Drive phases.
DSC08805.jpg


42
 

Attachments

  • DSC08802.jpg
    DSC08802.jpg
    276.7 KB · Views: 3,210
  • DSC08803.jpg
    DSC08803.jpg
    233.1 KB · Views: 2,898
  • DSC08804.jpg
    DSC08804.jpg
    265.1 KB · Views: 2,404
  • DSC08805.jpg
    DSC08805.jpg
    280.1 KB · Views: 2,332
  • DSC08806.jpg
    DSC08806.jpg
    244.3 KB · Views: 2,370
Database file updated with heights for the building. Taller 32-storey tower is 105.5 metres high.

@DonValleyRainbow

42
 
That address will change by the time the towers are constructed: each one will get an address on O'Neill Road.

42
 
upload_2017-11-4_12-2-17.png


upload_2017-11-4_12-3-55.png


upload_2017-11-4_12-4-53.png
 

Attachments

  • upload_2017-11-4_12-2-17.png
    upload_2017-11-4_12-2-17.png
    76.2 KB · Views: 2,191
  • upload_2017-11-4_12-3-55.png
    upload_2017-11-4_12-3-55.png
    83 KB · Views: 2,123
  • upload_2017-11-4_12-4-53.png
    upload_2017-11-4_12-4-53.png
    86.7 KB · Views: 2,151
Received email that construction is about to begin and updated presentation centre hours.

Seems like the presentation centre minus the parking lot will remain to operate even after construction begins.
 
Pic from 2/24
MVIMG_20180224_175752.jpg

The showroom's parking is now closed and fenced (not when this pic was taken). The balcony section of the showroom along with the signage is being deconstructing as well.

Pic from 3/20
MVIMG_20180320_185508.jpg
MVIMG_20180320_185518.jpg


Nothing exciting happening yet. Mostly removing/clearing the earth that been sitting here for years.
 

Attachments

  • MVIMG_20180224_175752.jpg
    MVIMG_20180224_175752.jpg
    189.5 KB · Views: 2,033
  • MVIMG_20180320_185508.jpg
    MVIMG_20180320_185508.jpg
    308.5 KB · Views: 2,007
  • MVIMG_20180320_185518.jpg
    MVIMG_20180320_185518.jpg
    222.8 KB · Views: 2,065
Seems like things are moving along with the warmer weathers(?). The parking is now mostly gone and lot of heavier machines are on site so can't wait when the dig starts.

MVIMG_20180411_185415.jpg
 

Attachments

  • MVIMG_20180411_185415.jpg
    MVIMG_20180411_185415.jpg
    258.9 KB · Views: 1,988
This will be quite a dig since it's got 2 phases with parkings down to p5. I wonder when will the construction of the extension of O'Neil Rd to Donway W Rd start.

photo via @rristic on Instagram
Screen Shot 2018-05-18 at 13.01.37.png

Screen Shot 2018-05-18 at 13.01.26.png

Screen Shot 2018-05-18 at 13.01.41.png
 

Attachments

  • Screen Shot 2018-05-18 at 13.01.37.png
    Screen Shot 2018-05-18 at 13.01.37.png
    886.2 KB · Views: 2,014
  • Screen Shot 2018-05-18 at 13.01.41.png
    Screen Shot 2018-05-18 at 13.01.41.png
    562 KB · Views: 1,948
  • Screen Shot 2018-05-18 at 13.01.26.png
    Screen Shot 2018-05-18 at 13.01.26.png
    794.8 KB · Views: 1,947

Back
Top