Project Essentials / dataBase – detailed project information, floor plans, renderings
Projects & Construction Thread
Queens Quay Place at Bayside 
255 Queens Quay E, Toronto
Developer: Hines

Queens Quay Place at Bayside | ?m | 9s | Hines | Pelli Clarke Pelli

Discussion in 'Buildings' started by taal, Mar 21, 2012.

  1. taal

    taal Senior Member

    Joined:
    May 19, 2007
    Messages:
    6,556
    Likes Received:
    55
    Location:
    NYCC
    They're starting to market 2 office buildings in East Bayfront. Both 9 floors ~ 200,000 square feet.

    I wish em luck but don't have high hopes at all.
    It'll be a big challenge to attract tenants to an area that effectively doesn't exist today; Moreover is completely outside the traditional leasing districts.

    Having said that office development is key for East Bayfront / the waterfront in general.

    I doubt the design is final so I wouldn't read too much into it.

    [​IMG]
     
    Last edited: Mar 21, 2012
    #1

  2. marcus_a_j

    marcus_a_j Senior Member

    Joined:
    Apr 23, 2007
    Messages:
    2,754
    Likes Received:
    346
    I don't think they will have a big problem attracting tenants. Corus and GBC are right beside the Hines site, plus the tremendous success of Sherbourne Common and Sugar Beach are tangible examples of the investments made into East Bayfront. This whole area will be very successful I believe and there are companies that would jump on the opportunity to lead the charge into the East Bayfront district. This area is on the radar, just look at Coca-Cola moving into 333 King E just a few blocks north. Success of East Bayfront depends on many factors and additional investments; prime example being the implementation of transit on QQE.
     
    #2
  3. DSC

    DSC Senior Member

    Joined:
    Jan 13, 2008
    Messages:
    9,160
    Likes Received:
    3,631
    Location:
    St Lawrence Market Area

    Yes, decent transit on QQ East is really a must if this area is going to develop - the TTC's current idea of extending the 6 Bay bus to Lower Sherbourne is hardly going to do it.
     
    #3
  4. moutarde.tigre

    moutarde.tigre New Member

    Joined:
    Feb 15, 2012
    Messages:
    6
    Likes Received:
    0
    Do you know which block(s) these two office buildings are to be located? Presumably along some of the more easterly blocks?
     
    #4
  5. AlvinofDiaspar

    AlvinofDiaspar Moderator

    Joined:
    Apr 22, 2007
    Messages:
    24,573
    Likes Received:
    10,526
    Location:
    Toronto
    #5
  6. UrbanFervour

    UrbanFervour Active Member

    Joined:
    Apr 24, 2010
    Messages:
    620
    Likes Received:
    190
    Are these renders official? Kind of boring... I thought the waterfront was going to champion innovative design?
     
    #6
  7. AlvinofDiaspar

    AlvinofDiaspar Moderator

    Joined:
    Apr 22, 2007
    Messages:
    24,573
    Likes Received:
    10,526
    Location:
    Toronto
    Here is what taal said, right above the rendering:

    AoD
     
    #7
  8. CanadianNational

    CanadianNational Senior Member

    Joined:
    Apr 24, 2007
    Messages:
    1,485
    Likes Received:
    21
    Location:
    Downtown Toronto
    Taal: thanks for posting that.
     
    #8
  9. taal

    taal Senior Member

    Joined:
    May 19, 2007
    Messages:
    6,556
    Likes Received:
    55
    Location:
    NYCC
    Yep np, that site is a good location for such updates, which generally aren't widely marketed outside of 'commercial leasing agents'.

    More interestingly you do see projects listed and then taken down, you may recall Monde at the start had a large office component, 300,000, that was marketed on the site as well but taken down. After all this they made the announcement they're converting the office space to residential.
     
    #9
  10. Automation Gallery

    Automation Gallery Superstar

    Joined:
    May 5, 2007
    Messages:
    11,090
    Likes Received:
    1,175
    Location:
    South Parkdale
    I think even though there is a lot of hype for that area... they will will have to get in the back of the line, and for the time being attract dribs and drabs of smaller tenants until the action cools down at Southcore. Long term, say 10-15 years they might be OK
     
    #10
  11. buildup

    buildup Senior Member

    Joined:
    Apr 26, 2007
    Messages:
    2,130
    Likes Received:
    252
    Not everyone can afford SouthCore. These will lease nicely and cost about half. If you are a smaller firm with a tight budget, need access to downtown clients, and want modern facilities - why not?
     
    #11
  12. innsertnamehere

    innsertnamehere Superstar

    Joined:
    Mar 8, 2010
    Messages:
    11,588
    Likes Received:
    4,875
    Location:
    Hipsterville
    thing is that without the queens quay streetcar this facility will have no easy access to the core..

    and something badly needs to begin construction down there. whether it be monde, or the second phase of George Brown, or even better, the queens quay streetcar / street reno
     
    Last edited: Jun 29, 2012
    #12
  13. AlvinofDiaspar

    AlvinofDiaspar Moderator

    Joined:
    Apr 22, 2007
    Messages:
    24,573
    Likes Received:
    10,526
    Location:
    Toronto
    Last edited by a moderator: Jan 22, 2018
    #13
    ADRM likes this.
  14. AlvinofDiaspar

    AlvinofDiaspar Moderator

    Joined:
    Apr 22, 2007
    Messages:
    24,573
    Likes Received:
    10,526
    Location:
    Toronto

Share This Page