Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

Feb 19, 2023

74F802DE-677D-4C97-BFBB-576E8D8077B8_1_201_a.jpeg



0039E419-DCF4-43D2-9550-DCBFFE425980_1_201_a.jpeg



B447CAD7-79F5-4899-91A1-753FE5B3EC86_1_201_a.jpeg



66AC4CDD-8BB2-4D99-8A22-1F98D4B6C732.jpeg



6352F88D-EA6E-48BC-B034-1D98A8803D4D.jpeg
 

Attachments

  • 66AC4CDD-8BB2-4D99-8A22-1F98D4B6C732.jpeg
    66AC4CDD-8BB2-4D99-8A22-1F98D4B6C732.jpeg
    413.7 KB · Views: 53
  • 61286971-98A6-4AE9-A133-20F157A54629_1_201_a.jpeg
    61286971-98A6-4AE9-A133-20F157A54629_1_201_a.jpeg
    461.8 KB · Views: 56
Monday Afternoon at 2:35 PM - when the other sites in the area appear to have completed outside construction activities for the day (if they started at all given the weather forecast), work is still going strong at Portland Commons. The Ellis Don team is really pushing it on this project!!!

20230227_143525.jpg
 
Portland Commons continues to grow. A larger portion of the forming for the Tenth floor is now in place, with some core forming sections reaching up to the Eleventh floor. Other visible changes include the glazing along the Portland Street side, now in place for the Second and Third floors, and the floor decking for the projecting section in the north-east corner of the Sixth Floor (left edge of the photo) has been installed.

20230327_154645.jpg
 

Back
Top