Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

Jun 28, 2021

A6E2F450-F7A1-4E48-83C0-1C6284307FC8_1_201_a.jpeg



96B07831-7070-49B5-927F-5F46AB10EE31_1_201_a.jpeg



08494044-1299-4736-B098-8370E4FE7310.jpeg



C6064EE3-19C9-45EF-81B1-BE7C164BB05F.jpeg



2E84277E-C264-46B7-99A2-0BB0EF05B0E5.jpeg



70E2DEA7-3D46-4EBE-828B-12B740948B54.jpeg



C2214131-B8E3-4BE2-AE33-CAC2144E88BE_1_201_a.jpeg
 
All told, looks like it was a good day for the crane raising crew. The tower crane components were as sufficiently lifted into place and assembled that the mobile crane was packed up and drove away by 7:30 PM, with the tower crane final assembly and check-out activities completed and the boom lifted into its normal resting position by 8:40 in the evening. The full street closure booking, from 7 AM to 10 PM for both Saturday and Sunday, in case of unforeseen difficulties or delays, not needed, and the crew can enjoy the rest of the long weekend.

20210731_172051.jpg


After the boom has been connected, one of the crew walks along the outside of the boom to detach the mobile crane's hoisting cables. Not a job I would want....

20210731_175609.jpg




20210731_175802.jpg


20210731_181419.jpg


Counter weights being lifted into place.

20210731_181804.jpg


7:30 PM - Mobile craned packed up and gone, traffic cones removed and the street is open again.

20210731_193634.jpg


Final touches and check-out.

20210731_193646.jpg


8:40 PM - A job well done.

20210731_204820.jpg
 

Attachments

  • 20210731_111111.jpg
    20210731_111111.jpg
    190.8 KB · Views: 111
  • 20210731_111105.jpg
    20210731_111105.jpg
    323.4 KB · Views: 99
Last edited:
Unlike the installation of the first tower crane at Portland Commons, which sat idle for quite a while - for at least two weeks or more since its installation - after commissioning checks this morning, the second crane appeared to be working this afternoon.

20210803_133056.jpg
 