Does anyone know if the shoring been done on the third tower to commence after sales have been finalized?
 

urbanexplorer

Active Member
Member Bio
Joined
Oct 15, 2012
Messages
197
Reaction score
525
View from my rooftop this AM. The three of these are really going to create quite an impact of moving the core southwards from this angle.

9FF840F5-3395-4B08-9B32-FC83070B6CA9.jpeg
BEFF0AAF-AF4D-4FA3-8811-4FAC417EEA24.jpeg
FCD4A05C-A913-41A5-A58E-4713E1492A11.jpeg
 

polesingularity

New Member
Member Bio
Joined
Dec 14, 2017
Messages
60
Reaction score
354
Third tower shoring and excavation has not started, but would be interested to know when it’s planned. Anyone know?

It's been discussed a fair bit earlier in the thread, but the main takeaway is that they can't start work on Phase 3 until the Yonge/Harbour intersection has been realigned. That itself won't happen until the City feels like getting to it -- as far as I can tell, it's still not in the list of planned construction projects.
 

enrigue8

Active Member
Member Bio
Joined
Jan 31, 2016
Messages
412
Reaction score
829
Location
Quebec city
From this photo from instagram, claddings from balconies are totally gone.

I hope that the future cladding will have high quality materials to make the building stand out from other bland looking towers. This building turned out to be so nice. I hope that pinnacle will not ruin everything with poor quality materials.

Please, Pinnacle... Keep its good look.
View attachment 389683


277801206_659200375160567_7759657328321681794_n-1.jpg
 
Last edited:

3Dementia

Senior Member
Member Bio
Joined
Apr 24, 2007
Messages
3,515
Reaction score
5,184
Lower Yonge Precinct Plan: I understand that the Harbour St east extension will travel between One Yonge Phases 1, 2, 3 and Phase 4, 5, and there may be plans to eventually rebuild Yonge from Queens Quay to Front… but assuming the One Yonge Phase 3 parcel is not directly impacted, why would realignment plans prevent Phase 3 from proceeding when Pinnacle’s sales targets are reached?

Would there be construction staging issues for Phase 3 (Freeland Street issues?), or is just that the City believes the new infrastructure (Harbour St. Extension) is needed to service another 80 storeys of residents?
 

whatever

Senior Member
Member Bio
Joined
Nov 25, 2007
Messages
2,890
Reaction score
1,039
I thought Phase 3 would at least encroach on Harbour during construction (or, if not, close a lane of it?), and that's why new Harbour had to be opened to Freeland before old Harbour was closed and Phase 3 could go ahead?

Or am I mistaken?
 

whatever

Senior Member
Member Bio
Joined
Nov 25, 2007
Messages
2,890
Reaction score
1,039
I have my road names messed up, I thought that that little on-ramp lane at the north side of 1-7 Yonge leading from Yonge to Lake Shore was technically Harbour, I didn't realize that that lane was actually signed as Lake Shore.

But yes, I thought it was a lane closure issue, though I can't see anything posted anywhere to support that.
 

mburrrrr

Senior Member
Member Bio
Joined
Feb 9, 2010
Messages
1,231
Reaction score
16,688
It sure seems like it is possible that they could start phase 3 from looking at the surface, once they have enough space to work. All the work is within the current property line but maybe there was some underground obstructions?
4 large towers going up in the near future. Which one is next?

737362D4-F52F-489D-B81E-FF3B83B58550.jpeg


Phase drawing from the site plan approval.
0448E713-6BB8-4FB5-AA2A-BD825ECFEB8E.jpeg


8A080CB7-EA88-4939-A834-3BDEDBC09BE6.jpeg
 

mburrrrr

Senior Member
Member Bio
Joined
Feb 9, 2010
Messages
1,231
Reaction score
16,688
I’m assuming these are the last two rows of balcony glass. I guess we’ll see next week if these disappear or if they have the replacement glass and this will start to rise again.
Edit: After further review of the March 2 picture, the current glass, shown below, has two square tags so this must be the final/factory inspected/replacement glass.
2C531CC7-7402-4A3B-B17B-79BE424BA0AD.jpeg


March 2 below
E5AA24DB-EB4B-46E8-B76E-E6787461170B.jpeg



684ACF8B-68A2-42DE-93BE-296CAC222636.jpeg


C77DE73F-94BA-4514-928F-792E8E41E63C.jpeg


D60921F4-AB1B-426A-8D57-71601907AE25.jpeg


8B2C8B64-0425-4E75-AF19-6FB8754B4F82.jpeg


AE74BAFD-C108-41E6-AC2E-7F1D62FEE15B.jpeg


D37E8FFF-7EEC-4C95-8F10-825B947BFBF3.jpeg
 