Toronto Pinnacle One Yonge | 344.9m | 105s | Pinnacle | Hariri Pontarini

There's some mobile crane action going on, but it's just out of my view. Anyone got a clean shot?
They are off loading the top section of the new tower crane.
53C4956C-FAFD-4250-BBBC-87AC20B17475.jpeg


9F9C1CDF-AE3C-47E9-BAAB-7A99869D0001.jpeg
 
Seems like offloading the cabin portion of the crane is a little counter-intuitive. Unless they're planning on building the tower crane top down!! 🤣 🤣 🤣
I think, depending on the type of crane, sometimes they have to attach the cabin to other parts on the ground first before hoisting it on top of the vertical leg. The same with the horizontal arm, it comes in pieces and it gets assembled on the ground first.
 

Back
Top