Not impossible, but very inflexible and difficult to expand, compared to other AGT or APM technologies. You have to gut the whole T1 station hardware and move it out, even if you just want to keep it simple and just have one train per line. I can't recall where the drive motor is (I suspect Viscount) but it's a nontrivial task. Heck, the system was down for 6 months just to replace the main haul ropes a year or so ago.
The system you're thinking of is likely the new Doppelmayr installation in Oakland - which ended up costing almost half a billion dollars. It also has a ridiculously complex haul rope system that requires trains to stop halfway between stations to switch ropes, which takes almost a full minute. I'm an engineer and I love overly complex stuff, but I don't think this is what we want here.
The system you're thinking of is likely the new Doppelmayr installation in Oakland - which ended up costing almost half a billion dollars. It also has a ridiculously complex haul rope system that requires trains to stop halfway between stations to switch ropes, which takes almost a full minute. I'm an engineer and I love overly complex stuff, but I don't think this is what we want here.