ethan.l.cecc
Active Member
Photos from tonight and last night, including catching them lowering a panel in, and showing that there will be a slight overhang at the jog in the pedestrian walkway
From today, showing a new structure being built west of the pedestrian bridge
View attachment 664091View attachment 664092
This will be excavation for the station entrances?Finally,
That's the gantry crane track. It'll go from the bridge to just past James Street and will enable the efficient removal of spoil from the excavation into a steady lineup of trucks exiting onto Bay Street. Once the crane is installed, that's it, we're getting 24 hour digging for about a year.
This will be excavation for the station entrances?