Toronto Ontario Line: Queen Station | ?m | ?s | Metrolinx | HDR

Photos from tonight and last night, including catching them lowering a panel in, and showing that there will be a slight overhang at the jog in the pedestrian walkway

20250703_204818.jpg
20250702_203412.jpg
20250702_203443.jpg
 
From today, showing a new structure being built west of the pedestrian bridge

View attachment 664091View attachment 664092

Finally,

That's the gantry crane track. It'll go from the bridge to just past James Street and will enable the efficient removal of spoil from the excavation into a steady lineup of trucks exiting onto Bay Street. Once the crane is installed, that's it, we're getting 24 hour digging for about a year.
 
Finally,

That's the gantry crane track. It'll go from the bridge to just past James Street and will enable the efficient removal of spoil from the excavation into a steady lineup of trucks exiting onto Bay Street. Once the crane is installed, that's it, we're getting 24 hour digging for about a year.
This will be excavation for the station entrances?
 
This will be excavation for the station entrances?

Not just the entrances, the entire station. They're going to dig two massive holes on either side of Yonge, mine under the existing station and then build the station up to ground level.

211007_queenstationcrosssection-2-jpg.643510


subway ontario line queen RnAyIzlG2w.png



Here's a diagram of the gantry crane being installed:

screenshot-2025-05-29-at-16-09-57-png.654862
 