More escalators mean more cost to purchase, install and maintain them in the long run. Better to have 3 longer escalators all the way down than 2 to an intermediate level and 2 more to platform level.

Sigh OBC. When up to 20m escalators is common, and up to 40m is possible.

I imagine this is what someone bringing ideas to TTC/Metrolinx to save costs hears from them - excuses on why it can't be done, when it can! There's a reason that North American transit costs are so high...
Also means that should one escalator be down for maintenance, there still is others available to at the very least part of the run.

That was the problem with the Spadina moving walkway, there was only one in each direction. Should have been split to go at least half way. That's how they do it at airports.
 

toronto647

Active Member
Member Bio
Joined
Mar 7, 2020
Messages
688
Reaction score
1,269
Ontario Line Science Centre Update

I apologize if this was already mentioned but was new information I found after speaking with CreateTO and various senior city officials.

Metrolinx is acquiring a portion of the western part of the @HousingNowTO at 805 Don Mills where the Ontario Line will travel over. For the lost space, Housing Now / CreateTO will purchase a small plot of land from the Church at Eglinton & Ferrand. This will allow Ferrand Drive to open up on Eglinton and to Gervais through a 4 way signal light. Furthermore, Ferrand Drive will be extended south pass Rochefort to St. Dennis Drive. This will create easier transit flow to the bus terminal and less gridlock in the area.

I suspect this information will be more detailed in the North Civil's RFQ which will be released in the Fall.

See pictures below:

Screen Shot 2022-01-31 at 7.03.04 PM.png
Screen Shot 2022-01-31 at 7.05.56 PM.png
Screen Shot 2022-01-31 at 7.25.51 PM.png
 

W. K. Lis

Superstar
Member Bio
Joined
Dec 24, 2007
Messages
23,203
Reaction score
13,665
Location
Toronto, ON, CAN, Terra, Sol, Milky Way
The Barrie Line isn't stopping at King-Liberty, so it's a choice between a station that serves one line and a station that serves a different line. Exhibition still makes more sense.
Can change in the later years. They can add, subtract, switch, or move the flow around.
 

ARG1

Senior Member
Member Bio
Joined
May 28, 2020
Messages
2,226
Reaction score
5,575
Location
Ottawa
Can change in the later years. They can add, subtract, switch, or move the flow around.
Not that easily. They're still only build the platforms on the Kitchener Line tracks, which means for the barrie line to access those platforms, they need to step over the Kitchener Line's trackspace, which goes against how Metrolinx is planning for GO.
 

44 North

Senior Member
Member Bio
Joined
Feb 8, 2010
Messages
3,796
Reaction score
2,307
Location
Ward 28
There is one kinda obvious advantage....escalators need maintenance and sometimes break.....having them split allows that to be done in stages and allows for better passenger experience while the work is being done.

Can still break it up, by having six really long escalators side-by-side.

Now at its root does this stem from King's Cross fire / Trench Effect? Surely any issues with a long escalator can be solved with modern fire suppression and ventilation. Needs to be an exemption.
 

HousingNowTO

Senior Member
Member Bio
Joined
Sep 16, 2020
Messages
1,019
Reaction score
2,598
Location
Toronto, ON
Ontario Line Science Centre Update

I apologize if this was already mentioned but was new information I found after speaking with CreateTO and various senior city officials.

Metrolinx is acquiring a portion of the western part of the @HousingNowTO at 805 Don Mills where the Ontario Line will travel over. For the lost space, Housing Now / CreateTO will purchase a small plot of land from the Church at Eglinton & Ferrand. This will allow Ferrand Drive to open up on Eglinton and to Gervais through a 4 way signal light. Furthermore, Ferrand Drive will be extended south pass Rochefort to St. Dennis Drive. This will create easier transit flow to the bus terminal and less gridlock in the area.

I suspect this information will be more detailed in the North Civil's RFQ which will be released in the Fall.

See pictures below:

View attachment 378276View attachment 378277View attachment 378278
Did those images come from Toronto AIC - or somewhere else..? Thx!
 

toronto647

Active Member
Member Bio
Joined
Mar 7, 2020
Messages
688
Reaction score
1,269
Did those images come from Toronto AIC - or somewhere else..? Thx!

Yes came from Toronto AIC through the revised documents submitted to the city last week. The other comments about the Church land property came through a community consultation. The comments about the Ferrand Drive south extension came from the Rochefort redevelopment submission through AIC. The comments about the Ontario Line on the Housing Now Lands came from Metrolinx and backed up by your folks submission.
 

HousingNowTO

Senior Member
Member Bio
Joined
Sep 16, 2020
Messages
1,019
Reaction score
2,598
Location
Toronto, ON
Yes came from Toronto AIC through the revised documents submitted to the city last week. The other comments about the Church land property came through a community consultation. The comments about the Ferrand Drive south extension came from the Rochefort redevelopment submission through AIC. The comments about the Ontario Line on the Housing Now Lands came from Metrolinx and backed up by your folks submission.
Thanks - need to look at the new stuff in AIC.
 

ARG1

Senior Member
Member Bio
Joined
May 28, 2020
Messages
2,226
Reaction score
5,575
Location
Ottawa

ViveleCanada

Active Member
Member Bio
Joined
May 3, 2019
Messages
123
Reaction score
233
Hopefully this doesn't happen to the OL

*Knock on wood* I think the Ontario Line should be fine since it's using catenary technology rather than the Innovia technology that's used in Scarborough. Ottawa's frankenstein half-LRT half-metro made it through January's snowstorm without incident.
 

robmausser

Senior Member
Member Bio
Joined
Dec 16, 2013
Messages
3,969
Reaction score
6,295
Hopefully this doesn't happen to the OL


The OL wont be built with gadgetbahn fantasy "wanna-be Maglev" technology like the SRT.

Who knew that pulling a motor apart and laying it out along the entire track would be susceptible to even the smallest amount of snow?
 

generalcanada

Active Member
Member Bio
Joined
Feb 19, 2020
Messages
654
Reaction score
1,490
also remember that the streetcars worked "semi-fine" the only problem being traffic.

TTC line 1 had issues but only because they needed to run slowplowing trains around davisville and yorkdale parts of the lines.
 

officedweller

Senior Member
Member Bio
Joined
Apr 24, 2007
Messages
3,270
Reaction score
1,642
The OL wont be built with gadgetbahn fantasy "wanna-be Maglev" technology like the SRT.

Who knew that pulling a motor apart and laying it out along the entire track would be susceptible to even the smallest amount of snow?

That's right - the clearance between the linear induction motor and the reaction rail is 11mm.
That's where the snow or ice build-up is a problem.
 