Database file coming soon, but in the meantime, here is the first rendering:

07_Future Ontario Line station building at southeast corner of King St E and Berkeley St (Cork...jpg
 

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
15,620
Reaction score
16,559
Location
St Lawrence Market Area
Considering that IO is intending to build LOTS of towers on the adjacent First Parliament site it seems VERY odd that this is a one storey building. And what looks like a rather boring one too!
 

TossYourJacket

Senior Member
Member Bio
Joined
Feb 22, 2018
Messages
1,005
Reaction score
2,471
Considering that IO is intending to build LOTS of towers on the adjacent First Parliament site it seems VERY odd that this is a one storey building. And what looks like a rather boring one too!
I wonder if we're gonna see something similar to what Ottawa did at Lyon station. That was built as a one story building, and then a condo tower was added on top after the entrance was built.
 

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
26,037
Reaction score
30,686
Location
by the Humber
I wonder if we're gonna see something similar to what Ottawa did at Lyon station. That was built as a one story building, and then a condo tower was added on top after the entrance was built.
I certainly hope you're right about that, and that that will be par for the course for the stations on this line, the rule and not the exception.

Here's the neighbourhood context map:

olta_downtown_segment_maps_mx_engage_corktown_20220203_final.png


Meanwhile, the thread for the non-station buildings at this site is here.

42
 
Last edited:

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
15,620
Reaction score
16,559
Location
St Lawrence Market Area

innsertnamehere

Superstar
Member Bio
Joined
Mar 8, 2010
Messages
17,328
Reaction score
16,595
Metrolinx has some pretty dense plans for development atop the station here:

 

afransen

Senior Member
Member Bio
Joined
Apr 22, 2007
Messages
5,761
Reaction score
5,241
Metrolinx has some pretty dense plans for development atop the station here:

I thought Infrastructure Ontario is driving it--not Metrolinx?

I find the renderings very misleading. Could IO and ML not cooperated to show what the stations would actually look like, at least conceptually for the TOD (massing etc.).
 

DSC

Superstar
Member Bio
Joined
Jan 13, 2008
Messages
15,620
Reaction score
16,559
Location
St Lawrence Market Area
Just about done. So, once that’s clear- is the plan to do the archaeological dig up of the parliamentary foundations and move them elsewhere?
View attachment 392666
I think the archaeology is done. The First Parliament building was a wooden house and really had few foundations. The buildings were burnt in 1813 and not much there, an earlier excavation about a decade ago found burnt floors but not much else.
 

The Preservationist

Active Member
Member Bio
Joined
Jun 26, 2020
Messages
425
Reaction score
995
Location
Toronto
I actually like the low rise pavilion however given the location an added tower would make more sense. I think it would be advantageous if they could keep the interior as open as the rendering suggests...
 

TossYourJacket

Senior Member
Member Bio
Joined
Feb 22, 2018
Messages
1,005
Reaction score
2,471
I thought Infrastructure Ontario is driving it--not Metrolinx?

I find the renderings very misleading. Could IO and ML not cooperated to show what the stations would actually look like, at least conceptually for the TOD (massing etc.).
As far as I understand it, Metrolinx had the idea for the TOC, and then IO will handle the actual procurement of the project. Which very well could mean that IO hires a different architect for the towers than Metrolinx does for the stations. Effectively they are two separate projects at this point, which is probably why Metrolinx put out a rendering of the station by itself. Ideally they should have put like, a ghost outline of a building above, but here we are. We do have IO's renderings of the TOC, but it seems those don't have accurate depictions of the station structures anymore (although the main difference is IOs version is blockier, with no curved glass on the corners, otherwise, they're both glass structures with the same layout).

It's also possible that the towers will end up being developed after the station is complete (Metrolinx has said TOC's may be built after the stations), so we could see the station be a stand alone pavilion for a period of time. Something similar happened in Ottawa where Lyon station had it's entrance built as a stand-alone structure and then a while later they began building a condo around/above it.

I actually like the low rise pavilion however given the location an added tower would make more sense. I think it would be advantageous if they could keep the interior as open as the rendering suggests...
Infrastructure Ontario has published architectural plans for the TOC sites, and the subway station layout is very similar to what is shown in the rendering in terms of being an open space, with elevators located between the sets of escalators/stairs, and columns around the perimeter. So while the rendering lacks the tower above the station, it seems the layout shown in the rendering is designed to support an overhead tower with no major changes.
 

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
26,037
Reaction score
30,686
Location
by the Humber
As far as I understand it, Metrolinx had the idea for the TOC, and then IO will handle the actual procurement of the project. Which very well could mean that IO hires a different architect for the towers than Metrolinx does for the stations. Effectively they are two separate projects at this point, which is probably why Metrolinx put out a rendering of the station by itself. Ideally they should have put like, a ghost outline of a building above, but here we are. We do have IO's renderings of the TOC, but it seems those don't have accurate depictions of the station structures anymore (although the main difference is IOs version is blockier, with no curved glass on the corners, otherwise, they're both glass structures with the same layout).

It's also possible that the towers will end up being developed after the station is complete (Metrolinx has said TOC's may be built after the stations), so we could see the station be a stand alone pavilion for a period of time. Something similar happened in Ottawa where Lyon station had it's entrance built as a stand-alone structure and then a while later they began building a condo around/above it.


Infrastructure Ontario has published architectural plans for the TOC sites, and the subway station layout is very similar to what is shown in the rendering in terms of being an open space, with elevators located between the sets of escalators/stairs, and columns around the perimeter. So while the rendering lacks the tower above the station, it seems the layout shown in the rendering is designed to support an overhead tower with no major changes.
IO is looking for a private partner to build the TOC, and the winner will bring whatever architects they want as past of their team, and that firm will have to accommodate what's going on re: the stations, whether the stations and the TOC are built in tandem or sequentially..