DonValleyRainbow
Senior Member
Member Bio
- Joined
- Mar 5, 2014
- Messages
- 2,867
- Reaction score
- 1,927
- Location
- Kay Gardner Beltline Trail
As much as I like this plan, there are some problems with it. How would you provide a connection to the Stouffville GO Line? Remember the hydro corridor is roughly equal distance between Steeles and Finch once in Scarborough. Also, an added station at Mc Nicoll (where the corridor parallels in Scarborough) it would have significantly slow down service on the Stouffville line.
The Big Move calls for Unionville GO to be a mobility hub: Highway 7 and 407 rapidways east and west, and another rapid transit line east, then down McCowan to STC.
I'll attempt to steer this discussion back to the Relief Line: DRL-short would provide connection to the Stouffville line via Line 2 and Main Street or Kennedy station. North of that, future connections could be made to Kennedy GO via Eglinton Crosstown, and Agincourt GO via Sheppard East (LRT or subway, whatever).