Nobody denies that there is a market for the western relief line. That market is just much smaller than what exists in the east, with the eastern Relief Line moving nearly twice as many people as the west.
Ok, fair enough, but let's compare the DRL Phase 1 (Pape to Osgoode = 7 kms) to Eglitnon-Crosstown Phase 1 (Mt Dennis to Kennedy = 19 kms). The scope of the latter is far greater than the former; including the massive 11 kms that will be tunneled. If the same tunneled kilometre formula was applied to the DRL Phase 1 (11 kms), we easily could have a subway stretching all the way from Danforth/Pape to Queen/Dufferin, at which point we'd have the option of either going up the rail corridor or continuing westward using Roncesvalles/Parkside as right-of-way in a future phase.
How much more can this possibly add to the costs and given the potential to alleviate chokepoints such as around Spadina, Bathurst and Liberty Village (Roncy/Queensway/King/Queen is also a chokepoint, but I digress)? This needs to be addressed. I don't think it's in Toronto's best interest to spend the next 15 years building something that will be quickly overwhelmed due to it's short length and the calls for expansion will be swift and immediate.