darth_freeman
Active Member
Has anyone considered this:
Phase 1 of the DRL is a subway from King station, up to Pape (5km).
Phase 2 is a subway from Pape to Don Mills/Eglinton to meet the Crosstown link (6km).
Phase 3 is an LRT from Don Mills/Eglinton to Don Mills/Sheppard which then curves east to fill out the rest of the Sheppard East LRT (6km to Sheppard and then east). This would let people in Scarborough take an LRT all the way to Don Mills/Eglinton, and then easily transfer to the Crosstown or DRL subway .
The idea is that the ridership from Sheppard to Eglinton does not really require a subway and an LRT could be built very cheap through Don Mills as it is 6 lanes all the way from Eglinton to Sheppard. Also, it avoids an "LRT Stub" as is favoured by posters here for the Scarborough extension and gives a total length of ~16km for this combined DRL/Sheppard LRT.
Are there projected volume breakdowns by section? Pape to Eglinton could even be a tunneled LRT if volumes don't require a subway.
Phase 1 of the DRL is a subway from King station, up to Pape (5km).
Phase 2 is a subway from Pape to Don Mills/Eglinton to meet the Crosstown link (6km).
Phase 3 is an LRT from Don Mills/Eglinton to Don Mills/Sheppard which then curves east to fill out the rest of the Sheppard East LRT (6km to Sheppard and then east). This would let people in Scarborough take an LRT all the way to Don Mills/Eglinton, and then easily transfer to the Crosstown or DRL subway .
The idea is that the ridership from Sheppard to Eglinton does not really require a subway and an LRT could be built very cheap through Don Mills as it is 6 lanes all the way from Eglinton to Sheppard. Also, it avoids an "LRT Stub" as is favoured by posters here for the Scarborough extension and gives a total length of ~16km for this combined DRL/Sheppard LRT.
Are there projected volume breakdowns by section? Pape to Eglinton could even be a tunneled LRT if volumes don't require a subway.
Last edited: