kEiThZ
Superstar
@nfitz
Fair point. I think we're all waiting see more detailed design on Smart Track. I would submit that the jury is still out on whether they can shoehorn more rail in those corridors.
But I also think it's rather overly optimistic to expect that an $8 billion DRL to Sheppard (with no Western component outside downtown) will be up and running in the next 15 years. That's quite the political challenge. Starting from the perception of residents in the Western half of the city, right out to the price tag for this single transit line. This is why I anticipate a much smaller DRL.
That's why I'd rather not toss out the baby with the bathwater on ST. If you're sitting at Vic Park and Finch, ST with even 15 min service in a decade looks more promising than a DRL to anywhere near you in two decades.
Fair point. I think we're all waiting see more detailed design on Smart Track. I would submit that the jury is still out on whether they can shoehorn more rail in those corridors.
But I also think it's rather overly optimistic to expect that an $8 billion DRL to Sheppard (with no Western component outside downtown) will be up and running in the next 15 years. That's quite the political challenge. Starting from the perception of residents in the Western half of the city, right out to the price tag for this single transit line. This is why I anticipate a much smaller DRL.
That's why I'd rather not toss out the baby with the bathwater on ST. If you're sitting at Vic Park and Finch, ST with even 15 min service in a decade looks more promising than a DRL to anywhere near you in two decades.