Ontario Court of Justice Toronto | 96m | 17s | Infrastructure Ontar | Renzo Piano

LUVIT!

Active Member
Member Bio
Joined
Feb 12, 2008
Messages
742
Reaction score
405
I worked the the Supreme Court of Ontario in the 80s and that was an empty lot then! I recall a conversation then that this was to be a courthouse. This seems like ancient history to me. I had very big hair then!
 

PMT

Senior Member
Member Bio
Joined
Jul 13, 2016
Messages
3,077
Reaction score
5,224
Location
Turanna
This explains it:

Application: Building Additions/Alterations Status: Permit Issued
Location: 11 CENTRE AVE
TORONTO ON
Ward 27: Toronto Centre-Rosedale

Application#: 16 249947 BLD 00 BA Issued Date: Dec 9, 2016
Project: Other Shoring
Description: Proposal to excavate and install shoring with rakers for future couthouse (16 127424 STE)
 

innsertnamehere

Superstar
Member Bio
Joined
Mar 8, 2010
Messages
13,431
Reaction score
7,536
Well yea, the province is the only one who doesn't technically need municipal approval to build what they want. They usually do get it, but they don't need to.

The Feds often don't even offer that pleasure to the city, and just build what they want.
 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
14,226
Reaction score
6,615
Location
Mississauga, where cars rule city growth
On the other hand, the private sector can get away with digging and not completing 5, 10, 20 years down the road...like 10 Dundas E.

AoD
Then there was the old BA stub
 

waterloowarrior

Senior Member
Member Bio
Joined
Apr 25, 2007
Messages
1,763
Reaction score
42
Location
Ottawa
Building Application Status



Application: Building Additions/Alterations Status: Permit Issued

Location: 11 CENTRE AVE
TORONTO ON

Ward 27: Toronto Centre-Rosedale

Application#: 16 249947 BLD 00 BA Issued Date: Dec 9, 2016

Project: Other Shoring

Description: Proposal to excavate and install shoring with rakers for future couthouse (16 127424 STE)


BA Building Inspection Pt3
Inspection De Francesca, Anthony
 

AHK

Senior Member
Member Bio
Joined
Jan 12, 2010
Messages
1,014
Reaction score
1,501
Then there was the old BA stub
For those who may not be aware, prior to development of the current buildings in the Bay Adelaide Centre, an earlier development had been started around 1990, with excavation and construction of the below ground levels being completed, and a six or seven story centre core / elevator well section being built. The project was abandoned in 1993, leaving behind the centre core piece, generally referred to as 'the stub'. The stub remained as such for many years, until development of the Bay Adelaide West tower was built, at which time the stub was demolished. The underground parking garage, and the walkway between Scotia Plaza and The Bay were opened at some point after the initial project reached grade, and remained open through the duration of the stub's existence, and the subsequent construction of the Bay Adelaide Centre west tower, and more recently, the Deloitte building.
 

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
22,438
Reaction score
17,409
Location
by the Humber
By heading into the ground now, the province gets a head start on the building, even if not all the details are set of the areas above ground yet. The City is not interested in extending the lease on the courtrooms at Old City Hall (without looking it up right now, IIRC, they run out 2020), so they need to get going to avoid an extension that no one wants.