They are telling investors at least to prepare for a longer wait until it is done.
Productivity is down at Novus due to social distancing measures. Supply chain disruptions and potential work site closures risk delays and escalating costs and we are monitoring the situation.
- BentallGreenOak Update Q1 2020
 
Is the pedestrian path behind Novus still going to be a thing? I remember some early design drawings had it sketched in and possibly going underneath Strachan.
20DFB092-EC99-46C7-8B44-36FEDC79F7F6.jpeg
 
There is a path to the south but it terminates at Strachan.
I see that. But, question is if it will be a pedestrian path and if there are plans for it to cross under Strachan. From this picture it could just as well be a service/delivery vehicle lane. Big difference there.
 