Toronto Montgomery Square | 84.12m | 27s | Rockport Group | RAW Design

Appears to be almost topped out. From Allen Rd/Ridelle.
IMG_7383.JPG
 

Attachments

  • IMG_7383.JPG
    IMG_7383.JPG
    145.2 KB · Views: 597
That cantilever doesn't look safe. The front piece looks like it's going to tip over. Do these guys even know what they're doing?

Of course not! No one knows what they're doing - the entire city is full of fools and these guys are the biggest ones of all. It's a good thing you brought it up. Think you could help out?
 
Dec 02
Lots more up on site
38787714582_206f00fe1b_b.jpg

23953762737_c5119b2b2a_b.jpg

38787711502_4d8d42c83e_b.jpg

23953761607_30c217f72d_b.jpg

37932701375_49e0d6feb2_b.jpg

23954335297_8318a5c575_b.jpg

24946943828_7bfebdfa0e_b.jpg

38788292952_e0a7500d0a_b.jpg

38788294412_191428a2c6_b.jpg

27043154759_488f243500_b.jpg
 
And downtown Yonge and Eglinton now begins to spread north and south. Quite the dramatic change for the neighbourhood.
As well east with the west being next
 

Back
Top