Toronto Minto Yorkville Park Condos | 75.89m | 25s | Minto Group | IBI Group

Saturday

IMG_5108.JPG
IMG_5109.JPG
 

Attachments

  • IMG_5109.JPG
    IMG_5109.JPG
    360.7 KB · Views: 670
  • IMG_5108.JPG
    IMG_5108.JPG
    365.5 KB · Views: 706
Upward begins.

IMG_5550.JPG
IMG_5551.JPG
 

Attachments

  • IMG_5550.JPG
    IMG_5550.JPG
    361.5 KB · Views: 675
  • IMG_5551.JPG
    IMG_5551.JPG
    331.8 KB · Views: 675
And the pit.

IMG_5938.JPG
IMG_5937.JPG
IMG_5936.JPG
 

Attachments

  • IMG_5938.JPG
    IMG_5938.JPG
    422.1 KB · Views: 650
  • IMG_5936.JPG
    IMG_5936.JPG
    383.7 KB · Views: 637
  • IMG_5937.JPG
    IMG_5937.JPG
    410.7 KB · Views: 637
Sunday.

IMG_6118.JPG
IMG_6116.JPG
IMG_6117.JPG
 

Attachments

  • IMG_6118.JPG
    IMG_6118.JPG
    285.9 KB · Views: 648
  • IMG_6116.JPG
    IMG_6116.JPG
    395.3 KB · Views: 630
  • IMG_6117.JPG
    IMG_6117.JPG
    514.3 KB · Views: 643
Sunday.

IMG_6227.JPG
IMG_6225.JPG
IMG_6226.JPG
 

Attachments

  • IMG_6227.JPG
    IMG_6227.JPG
    307.5 KB · Views: 646
  • IMG_6226.JPG
    IMG_6226.JPG
    384.2 KB · Views: 673
  • IMG_6225.JPG
    IMG_6225.JPG
    390.3 KB · Views: 632
Excavation nearing completion.

IMG_6352.JPG
IMG_6355.JPG
IMG_6353.JPG
IMG_6354.JPG
IMG_6356.JPG
 

Attachments

  • IMG_6352.JPG
    IMG_6352.JPG
    252.6 KB · Views: 645
  • IMG_6355.JPG
    IMG_6355.JPG
    302.4 KB · Views: 616
  • IMG_6353.JPG
    IMG_6353.JPG
    306.1 KB · Views: 636
  • IMG_6354.JPG
    IMG_6354.JPG
    321.6 KB · Views: 629
  • IMG_6356.JPG
    IMG_6356.JPG
    263.6 KB · Views: 610
From September 20th:

1.jpg

We are excited to be moving on up!

Foundation waterproofing is well underway and we began placing steel and forming our perimeter walls using a method known as structural shotcrete. Shotcrete is an excellent alternative to a typical formed wall construction where concrete is applied using hoses and compressed air. The high pressure compacts the concrete while the finishing work is completed by hand leaving behind a near perfect surface. Structural shotcrete is faster than typical formwork construction and ideal for below grade work in hard to access areas or where there are impacts such as internal shoring.

Our formwork trade continues to place steel for the remaining raft slab & footings as well as vertical steel for interior columns & walls. The underground drainage trade follows close behind to run piping throughout the underground to complete the permanent drainage & sump system. Once this work is complete, we will backfill and begin pouring our slab on grade. Our Mechanical & Electrical trades have also mobilized to complete their work as steel is placed but before concrete is poured.

Stay tuned for further updates!

2.jpg
3.jpg
4.jpg
5.jpg
6.jpg
7.jpg
 

Attachments

  • 1.jpg
    1.jpg
    18.2 KB · Views: 643
  • 2.jpg
    2.jpg
    48.6 KB · Views: 602
  • 3.jpg
    3.jpg
    47.7 KB · Views: 591
  • 4.jpg
    4.jpg
    32 KB · Views: 616
  • 5.jpg
    5.jpg
    33.3 KB · Views: 613
  • 6.jpg
    6.jpg
    32.2 KB · Views: 600
  • 7.jpg
    7.jpg
    37.6 KB · Views: 626

Back
Top