Toronto Minto Westside | 68.88m | 20s | Minto Group | Wallman Architects

742BA18B-9569-4BA8-9F6D-994C54AEEE90.jpeg
AC56DBCF-7B31-418B-934F-39CD40A2C72A.jpeg
C1208077-184D-4B39-B087-9090AB0BC8A5.jpeg
5E4BEE56-BD88-4F7A-96F7-8944A44EB4BA.jpeg
FA812203-8386-42A3-A118-A75F3FEA96E8.jpeg
CE933252-3402-4A73-A314-B25D81DC28A8.jpeg
 
Really don't think the Front St. frontage was the appropriate place for that large screen and what I assume are fire exit doors.
 
I hope they're at least going to finish those columns- they don't bring to mind images of durability right now.
 
The commentary on this forum is laughable.

They will fit all the paneling and then take note of which panels need replacing. Check out minto 88 regarding the columns, it's not the finished product. Like damn guys, let them build the building.
 
The commentary on this forum is laughable.

They will fit all the paneling and then take note of which panels need replacing. Check out minto 88 regarding the columns, it's not the finished product. Like damn guys, let them build the building.

So we need to wait for the garbage to be complete before calling it what it is? Funny, Allied is building a residential project just north of here as well and it doesn't resemble this risible dreck in any way. It's also currently unfinished, btw.
 

Back
Top