I really hope East Harbour GO happens sooner than later, will really improve access to the area!

It won't be sooner; the entire station (not including GO tracks themselves) will likely be part of the Ontario Line project which would give it a target date closer to 2030.

The integration expected would be clumsy to implement as 2 separate tenders and the GO electrification tender in general has not been expected to included station modifications (except as required for clearance/grounding purposes).
 
A report to the Dec 1st meeting of Infrastructure and Environment Ctte recommends a project delivery agreement for the construction phase of the Lake Shore East do-over from the River to Carlaw.


The Harbour Lead is still there........

And it appears we could see construction set to start in July 2021!


1606230272048.png
 
I remain confused (again?) as to why they keep talking about the Harbour Lead Rail Line. From everything I hear elsewhere, Ports Toronto and CreateTO are in final stages of abandoning it (and it is now blocked off on east side of Don River.) Frankly, I would like to keep it operational (in the median as is proposed) but I think 'someone' needs to decide if it will actually exist and if it won't then update these plans and schedules to remove it.

I spoke w/City staff this morning.

Here is what I learned.

A cost-benefit analysis on whether to keep the Habour Lead is currently under way.

It will report back shortly.

If the verdict is to remove it, that decision will need to be made by February, and the change in scope can be accommodated without altering the timeline.

It's likely, though from what I can discern there isn't a final decision; that if the Harbour Lead is removed the design will stay substantially the same, but the portion of the median occupied by track will become landscaped median.

If the decision is made to keep the line, then the design will be built as is; and the matter of reconnecting the track via Leslie will be a separate project.
 
Last edited:
November 9, 2020
Lot more up on site
50647098576_eccf12a6f3_b.jpg

50647098806_c62fa3cc0d_b.jpg

50646356578_48c5cdcbb4_b.jpg

50647191682_90cf0beba5_b.jpg

50647099631_c350aa79d4_b.jpg

50647100291_e8b3e2b9aa_b.jpg

50646358078_099d2c5cd7_b.jpg

50647100836_bb152b9137_b.jpg

50646358763_a4e508bd2b_b.jpg

50647195362_ab45988a84_b.jpg

50646329828_b63f9346c5_b.jpg


Pier for the 3rd bridge over the new south mouth of the Don
50647073546_2540c710b3_b.jpg

50646330368_7127de55d1_b.jpg

50646330428_8fcd166227_b.jpg

50647073741_f08717b3f9_b.jpg

50647166352_f8bf498192_b.jpg

50647166397_7646f620c5_b.jpg

50647143842_7dd82e35fa_b.jpg
 

Back
Top