Toronto King Portland Centre and Kingly Condos | 57.6m | 15s | Allied | Hariri Pontarini

Looks like the King Portland Centre condominium units sold well this past weeked. From the press release:


RIOCAN AND ALLIED ANNOUNCE RESULTS OF CONDO MARKETING PROGRAM
AT KING PORTLAND CENTRE IN TORONTO’S DOWNTOWN WEST

Toronto, October 17, 2017

RioCan REIT (TSX:REI.UN) and Allied Properties REIT (TSX:AP.UN) today announced that the residential condominium units at King Portland Centre are substantially sold out, subject to customary closing conditions and rights of rescission. RioCan and Allied expect the profitability of these units to exceed initial expectations.

King Portland Centre is located at the northwest corner of King Street West and Portland Avenue in the heart of Toronto’s King West neighbourhood. In addition to the strength of its location, the development is unique, in that it will incorporate a restored heritage structure, 602-604 King West, with a substantial new mixed-use structure. The combined structures (at 100%) will be comprised of the following:

i. approximately 59,000 square feet of office and retail GLA in the heritage structure, which is fully occupied;

ii. approximately 256,000 square feet of additional office GLA in the new structure, which is 93% pre-leased to Shopify and Indigo and under construction;

iii. approximately 13,000 square feet of incremental retail GLA in the new structure with frontage on King West; and

iv. approximately 133 residential condominium units in the new structure with frontage on Adelaide West.
Having obtained registration with Tarion Warranty Corporation, RioCan and Allied offered the condominium units for sale on October 14, 2017. They expect purchasers to take possession in early 2019.

“The strong response to the sales launch of Kingly this past weekend affirmed the decision by RioCan and Allied to convert the project from rental to condominium. Our ability to effectively execute on the sale of the 133 condominium units in such a short time frame at favourable pricing illustrates the importance of good strategy, design and location. The higher than expected sales proceeds from Kingly have added to the economic success of King Portland Centre, and have further proven the capabilities of the joint venture between RioCan and Allied,” said Edward Sonshine, CEO of RioCan.

Each of Allied and RioCan owns an undivided 50% interest in King Portland Centre, and on completion Allied will manage the commercial component. Completion of the development is scheduled for early 2019.
 
Last edited:
Pic taken Oct 19, 2017


94sVRto.jpg
 
And from the 17th, more shots than absolutely necessary:

DSC05803.jpg
DSC05804.jpg
DSC05805.jpg
DSC05810.jpg
DSC05813.jpg
DSC05814.jpg
DSC05815.jpg
DSC05816.jpg
DSC05817.jpg
DSC05818.jpg
DSC05819.jpg
DSC05820.jpg
DSC05821.jpg
DSC05822.jpg
DSC05824.jpg


42
 

Attachments

  • DSC05803.jpg
    DSC05803.jpg
    282.7 KB · Views: 430
  • DSC05804.jpg
    DSC05804.jpg
    271.9 KB · Views: 414
  • DSC05805.jpg
    DSC05805.jpg
    295.3 KB · Views: 430
  • DSC05810.jpg
    DSC05810.jpg
    450.5 KB · Views: 421
  • DSC05813.jpg
    DSC05813.jpg
    335.6 KB · Views: 478
  • DSC05814.jpg
    DSC05814.jpg
    629.3 KB · Views: 411
  • DSC05815.jpg
    DSC05815.jpg
    400.6 KB · Views: 464
  • DSC05816.jpg
    DSC05816.jpg
    354.4 KB · Views: 438
  • DSC05817.jpg
    DSC05817.jpg
    643.8 KB · Views: 442
  • DSC05818.jpg
    DSC05818.jpg
    287.1 KB · Views: 429
  • DSC05819.jpg
    DSC05819.jpg
    328.6 KB · Views: 432
  • DSC05820.jpg
    DSC05820.jpg
    349.2 KB · Views: 437
  • DSC05821.jpg
    DSC05821.jpg
    747.8 KB · Views: 459
  • DSC05822.jpg
    DSC05822.jpg
    684.8 KB · Views: 447
  • DSC05824.jpg
    DSC05824.jpg
    321.4 KB · Views: 400
Much activity on the King Portland Centre site today (Saturday, December 2nd). Both tower cranes working all day. Multiple flat bed truck deliveries of window glazing sections, hoisted up and stored on site - from morning through late afternoon- a flat bed was pulling into the site at the King Street entrance at 3:30 PM. Concrete deliveries and pouring also taking place all day - at 3:30 PM, one truck was backed up into the stub lane off Portland, discharging concrete, and four more 'cement' trucks were lined up on the west side of Portland, waiting their turns.

Allied and RioCan appear to be really pushing the schedule on this one.
 