Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

University Avenue, Avenue Road, and Oriole Parkway were Highway 11A in Toronto.
LOL, and it was Church that was Highway 11 south of Davenport, on that figure, not Yonge!

That's the problem with the highway numbers - they haven't been official this century, they frequently changed, and few remember the idiosyncrasies.

Line 5 Highway 109 anyone?:)

Which I guess dates that map to 1953/1954.
 
If you want to discuss Highway 10/Hurontario Street, go here:



If you want to discuss the transit project, stay here.
 
Well I find it strange anyone still calls hurontario highway 10. Nothing about it screams highway and it just makes me think people are living in the past. I can understand people calling Rogers centre skydome because it’s fundamentally the same building with a corporate name attached. Hurontario looks vastly different today than what it did in the 90s yet alone the 50s.

I think it boils down to the fact that with Hurontario, the road being a highway came first but with Yonge the street status came first and the number later.
What makes Hurontario so unique with the "highway" name with other streets that are sometimes called highways is it's built form; an old 1960s suburb with commieblock apartment buildings and strip malls. Definitely not the same as Highway 27 with ditches, a wide ROW, and few driveways or intersections.

Another thing is the city it runs through. Mississauga is a suburban city that was once a rural township. This fuels a persistent, anachronistic sense of place that gets passed on to young people and newcomers. To use another example; ever notice Markham Rd. is still labelled 48 north of Steeles?
 
Was expecting something like this.

Crews are installing micropiles - used to stabilize the overhead railway corridor - for when the push box that forms the underpass is put into place. Micropiling activities are currently ongoing and will continue until middle of February.

Crews are also planning on pushing the box closer to the tracks to enable them to install the Verona system at the beginning of February. The Verona system is the temporary structural supports that are used to stabilize the railway corridor as the box is pushed underneath. In order to install the Verona System micropiles need to be installed first. The box will likely be pushed into place this March and takes approximately 3 weeks.

https://blog.metrolinx.com/2021/10/27/see-the-launch-pad-completed-in-preparation-for-hurontario-light-rail-transit-push-box/
 
The storage area is the Cooksville GO Transit old parking lot on the east side of Hurontario. Odd place to store the rail that will be use first for the section south of 407 to Matheson first, since this will be the testing zone. Construction start this year and supposed to be before June. Construction north from Port Credit is supposed to be Q3 with construction Thanksgiving weekend for the QEW.
 
Jan 14/22
Only saw crews working for the 2 blocks south of Dundas as well the plaza in Port Credit and the rest looks the same.

Saw the many piles of rail in the storage area as I drove by and will try to get shot ln the next few days.

The roof of the box is pour with the scaffolding for it being remove. Still working in the trench south of the box.

Wonder if they will start track bridge work this weekend as none was done last weekend.
51821306101_e85a4610b3_b.jpg

51821305856_3d5f617a8c_b.jpg

51821417918_641cd660c8_b.jpg

51822028530_bca6ea1031_b.jpg

51821417833_172190120d_b.jpg

51821305526_c517558b6d_b.jpg

51821647349_c952b27c7e_b.jpg

51821305386_027f1be17f_b.jpg

51821305361_46f98a4a20_b.jpg

51821646994_643d971248_b.jpg
 
Jan 16
Stop by the Port Credit GO Station and saw no one or any indications any work was done this weekend closure. Weather may had an effect of seeing no work or what was to take place.

Stop by the storage yard where the rails are being store for the line. Still a stack of 3 pack rail that will be broken and place on piles of single T rail. There is no grove rail as noted by Metrolinx Blog.
51825565246_94bf284e4c_b.jpg

51825673218_e1cf767bd1_b.jpg

51825908059_7223780c2d_b.jpg

51825908004_983b55c829_b.jpg


3 piece bundles
51825564981_fefac59dec_b.jpg
 
Peel Region staff did a report here on the Hurontario LRT (agenda here). It also covers the extension into downtown Brampton on Main Street.

Brief article about it in the Guardian.


One aspect that was left out of the above article from the report was this:

Transportation: The project will require the extension of the LRT tracks, Multi-Use Path, and relocation of the Steeles and Hurontario stop (Gateway Terminal stop) from the south side of Steeles and Hurontario to the north side, resulting in changes to the Regional intersection configuration. Regional staff are supportive of the City of Brampton’s plan to relocate the Gateway Terminal LRT stop from the south side of Steeles Avenue as currently planned by Metrolinx through the Hurontario LRT to the north side. According to traffic analysis, if the stop remains on the south side of Steeles Avenue, the number of pedestrians crossing is expected to increase substantially as a result of future growth and transfers from the LRT stop to the Brampton Gateway Terminal which is on the north side. This number is expected to increase if the LRT stop remains south of Steeles Avenue as a result of the Hurontario LRT Extension. Relocating the stop to the north side of Steeles would result in fewer conflict points, lowering the risk of vehicular collisions with vulnerable road users.

This situation was actually covered in blog post here that was posted in this thread at the time.

 
Is this caused by the LRT work or a problem cased by the weather??

I guess Transit will have to use King that will be a bitch going east and do walking transfers.

It been a bitch last week with Bell doing its thing with 2 Police cars at the south-west corner. More was taking place south of King.

Stay away and don't use transit for this area.

Water main repairs shut down lanes of major intersection in Mississauga

 
As it stands, first of the guideway will start by the end of Q1 at Top Flight as well to OMSF.. Track work for OMSF is to start late Q1.

Work on going for building the foundation and piers for the elevated section.

First LRV is to arrive late Q4 this year and been move up from 2023.

Hwy.401 underpass bridge rehabilitation taking place at night and odd considering it is less than 10 years old. No work on Hwy 407 and 403 bridge work that was schedule for Q1 nor when it will happen..

Key Metrics:
Once complete, the entire project will use:89 km rail weighing approximately 5000 metric tonnes
55, 000 Monoblock and Twin bloc ties
32 km of Rail Encapsulation
13,000 metric tonnes of rail ballast
47,000m3 Guideway Concrete
Deliveries:120 segments of rail have now been delivered to the OMSF and 360 to the laydown area adjacent to Cooksville GO.. Each segment of rail is 25m in length
73 concrete hydro poles installed along with 22 km of cable

Another tunnel box like Port Credit will be use for the QEW this year with the location for building it not finalize yet. Odd they are doing it this way.

When id comes time to build the Guideway, it will be 6' deep to allow a duct bank to be build first, a slab of concrete on top of it to support the rail.

The PC locals are up in arms over the lost of parking spots as well Metrolinx selling the Go Land to a developer. Then there is the issue of no parking garage with the building of the LRT that was shown as part of the station redevelopment. They think the parking structure is part of the LRT project when it was never was, The city opposed the 4 to 8 story structure and supposed more transit use than parking. The City only wanted 15 story towers and will be getting around 22 story now. The city is failing to delivery on transit regardless of COVID 19.

Both the Hurontario and the Dundas teams need to be working together now to deal with the rebuilding of the intersection as well the locations of the station platforms.
 