UD2
Active Member
A drill was back on yonge street blocking off two lanes today. Although it's no longer the Emerald Park drill since EP have since moved their drill to another lovation.
No one will begrudge you if you serial post with useful information and pictures! Many of the regular snappers don't get up to NYCC much. so any info from the north country is useful, especially with a popular development like the HC.
A drill was back on yonge street blocking off two lanes today. Although it's no longer the Emerald Park drill since EP have since moved their drill to another lovation.
Does anyone know what is being built on the N/W corner and what is to come on the S/W corner next to Emerald Park?
There is a night crew now that smooths the concrete.
Ground floor is completely poured.
2nd floor is about 75%