Toronto Galleria 01 & 02 | 92.65m | 29s | Almadev | Core Architects

Oct 6, 2020

20201006_111822.jpg
20201006_111825.jpg
 
A bit interesting to see the crane located outside of the excavated construction pit. I'd reckon that the concrete platform south of the pit, visible in the middle of the background from photos 1-3, could be for a second crane.

Feb 16, 2021


20210216_085215.jpg
20210216_085303.jpg
20210216_085314.jpg
20210216_085337.jpg
 
Last edited:

Back
Top