Toronto Form Condos | 50.59m | 14s | Tridel | a—A

6E149F35-9B13-4799-9A4C-B7DDE7401C69.jpeg
AF09A36D-5E75-42F9-B53E-CC8DDCF955D0.jpeg
DC9F1CA3-4568-46D5-9427-F0DF916E0EC5.jpeg
4A60D64F-2B60-4D6B-A25B-1951FC884F39.jpeg
 
Those red steel supports are interesting to see; I presume they're structurally supporting some of the cantilevers?
 
Looks promising to me! (Especially for Tridel). I think the effect with the precast will be successful, but let's see more of it go up.
 

Back
Top