Form Condos | 50.59m | 14s | Tridel | architectsAlliance

ProjectEnd

Senior Member
Member Bio
Joined
May 28, 2007
Messages
9,945
Reaction score
12,930
It's a placeholder, yes. How long we'll be forced to bear it, however, is unknown as there is no publicly available timeline and Form's post-approval conditions are not public (if it even is one of those).
 

GenerationLee

Active Member
Member Bio
Joined
Mar 19, 2016
Messages
597
Reaction score
715
Location
Yonge and Eglinton
That ground floor makes me think this building must be for elves, dwarves, and goblins. I've stared at this building go up over the last two years...I have no words. Except this is why I generally don't expect anything from Tridel.
 

khristopher

Senior Member
Member Bio
Joined
Aug 28, 2007
Messages
8,561
Reaction score
368
Location
Toronto, ON
I really don't get all the hate for this project. I quite like it. The worst part is the ground floor. They should have just carried the building exterior right to the ground, with no inset.
 

UtakataNoAnnex

Active Member
Member Bio
Joined
Mar 5, 2020
Messages
689
Reaction score
574
That ground floor makes me think this building must be for elves, dwarves, and goblins. I've stared at this building go up over the last two years...I have no words. Except this is why I generally don't expect anything from Tridel.
Most of the Elves I know like their ceilings really high...
 

Top