Mississauga Oro at Edge Towers | ?m | 50s | Solmar | Rosario Varacalli

What does sweep of the boom mean? Also if that is the case, wouldn't it make more sense to set up the crane between towers instead of in the middle of each tower? That way the cranes can properly reach 2 towers each, and only 2 cranes needed for 3 towers.
Sweep: move swiftly and smoothly

1615993051974.png



 
March 31
They are putting the concrete railing support for the 3rd floor to allow the main tower to step back the podium size.
51088949093_c0aa39911d_b.jpg

51088492317_d229b67bb4_b.jpg

51088405596_1f2a2fd32b_b.jpg

51089217370_b59f4ac53e_b.jpg

51088476559_9d22ee0cff_b.jpg

51088949658_8e2e6b2d49_b.jpg

51088492802_2769c21d05_b.jpg

51088476939_80f9a77d7e_b.jpg

51088492992_3fc35d00fd_b.jpg

51089217965_d3ab2b2e58_b.jpg

51088406351_99b7075ac1_b.jpg

51088950298_bba859850f_b.jpg

[imghttps://live.staticflickr.com/65535/51088950398_7083ec378e_b.jpg][/img]
51088950543_4692c5de28_b.jpg

51088493667_b32906246e_b.jpg

51088488812_6e48100aff_b.jpg
 
May 24
things have slow down on tower 1
51201549886_2f7b019a32_b.jpg

51201549961_cc50d9f506_b.jpg

51202614195_2aae555705_b.jpg

51201752138_67442afc3d_b.jpg

51202327854_6caa74ca56_b.jpg

51201752833_acc35d2954_b.jpg

51202614985_92661ab8ec_b.jpg

51200835467_478c090205_b.jpg

51201753328_7bd3386c5d_b.jpg

51200835847_8885b565df_b.jpg

51202615550_85cb25ec8f_b.jpg

51202615605_cf9b4c1193_b.jpg

51202329539_469ffff043_b.jpg

51202329779_f7646e21b3_b.jpg

51202330354_ee370cc1fe_b.jpg

51201754563_d124b516e8_b.jpg
 

Back
Top