Project Essentials / dataBase – detailed project information, floor plans, renderings
Projects & Construction Thread  I  Real Estate Thread
Design Haus 
231 College St, Toronto
Developer: Shiu Pong

Design Haus | 52m | 17s | Shiu Pong | Kirkor Architects | Page 7

Discussion in 'Buildings' started by investican, Feb 13, 2013.

  1. salsa

    salsa Senior Member

    Joined:
    Sep 27, 2013
    Messages:
    7,581
    Likes Received:
    5,948
    Location:
    North York
    In that I can feel my stomach churning.
     
    #91
    arch_on_ and AlvinofDiaspar like this.

  2. bilked

    bilked Active Member

    Joined:
    Sep 13, 2013
    Messages:
    298
    Likes Received:
    362
    IMG_2185.JPG IMG_2186.JPG
     
    #92
    FrozenFury likes this.
  3. AlbertC

    AlbertC Senior Member

    Joined:
    Apr 24, 2007
    Messages:
    3,699
    Likes Received:
    823
    Location:
    Burnistoun
  4. stjames2queenwest

    stjames2queenwest Senior Member

    Joined:
    Sep 9, 2014
    Messages:
    2,474
    Likes Received:
    1,975
    I’ve been wondering when it would happen. It’s been boarded up for a year or more now.
     
    #94
  5. Blitz901

    Blitz901 New Member

    Joined:
    Feb 17, 2017
    Messages:
    6
    Likes Received:
    1
    320x240.
    The developers thinking about how rich they are going to be.
     
    #95
  6. greenleaf

    greenleaf Senior Member

    Joined:
    May 16, 2007
    Messages:
    2,355
    Likes Received:
    492
    Location:
    Downtown
    The old building on the corner is being demolished.

    http://app.toronto.ca/tmmis/viewAge...tion=getMinutesItemPreview&agendaItemId=52259

    2014 staff final report: “Before introducing the necessary Bills to City Council for enactment, City Council require the owner to incorporate elements of the north and west façades, as much as possible, of the existing building at 231-237 College Street into the design of the development, to the satisfaction of the Chief Planner and Executive Director, City Planning Division.”

    It apparently was not possible.
     
    #96
  7. wolfewood

    wolfewood Active Member

    Joined:
    Sep 4, 2012
    Messages:
    485
    Likes Received:
    267
    Goddammit.
     
    #97
  8. GenerationLee

    GenerationLee Active Member

    Joined:
    Mar 19, 2016
    Messages:
    488
    Likes Received:
    594
    Location:
    Yonge and Eglinton
    This is ridiculous.
     
    #98
  9. bilked

    bilked Active Member

    Joined:
    Sep 13, 2013
    Messages:
    298
    Likes Received:
    362
    Well in fairness to the developer, they obviously learned it wasnt going to be possible to preserve the building after discovering an excavator sticking out one the exterior walls.
     
    #99
    FrozenFury and interchange42 like this.
  10. jje1000

    jje1000 Senior Member

    Joined:
    May 19, 2007
    Messages:
    3,193
    Likes Received:
    814
    So the facade is going to be a reconstruction?
     
  11. PMT

    PMT Senior Member

    Joined:
    Jul 13, 2016
    Messages:
    1,973
    Likes Received:
    2,956
    Location:
    Turanna
    December 23. Almost all gone:
    upload_2017-12-25_0-3-11.

    upload_2017-12-25_0-3-23.
     
    stjames2queenwest likes this.
  12. Brown Vinyl Window

    Brown Vinyl Window New Member

    Joined:
    May 8, 2013
    Messages:
    26
    Likes Received:
    12
    Fantastic! Another lovely building lost... Here's to turning this grubby town into Dallas, Ontario.
     
  13. .dwg

    .dwg New Member

    Joined:
    Dec 28, 2017
    Messages:
    60
    Likes Received:
    53
    The biggest crime here isn't even the loss of the heritage facade - it's that a Kirkor monstrosity is going up in its place. It would be slightly more palatable if an architecture firm with some design aptitude was working on this site.
     
  14. Towered

    Towered Senior Member

    Joined:
    Apr 24, 2007
    Messages:
    3,213
    Likes Received:
    707
    The renders included the retention of the historic building on the corner...
     
  15. .dwg

    .dwg New Member

    Joined:
    Dec 28, 2017
    Messages:
    60
    Likes Received:
    53
    Yes, but you can see from the image above that the facade has been demolished. You can rebuild a facade, but I don't consider that "retention" of a facade of building.

    As an aside, the city is increasingly moving toward keeping heritage facades in place while new construction is underway, as opposed to demo-rebuild.
     

Share This Page